|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2024 Measured TD: 12185 ft. Vertical TD: 7592 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/20/2015 | | Proposed Top PZ Location: | Sec:14 Twp: 1N 66W | Footage: 744 FSL 473 FEL | | Bottom Hole Location: | Sec:14 Twp: 1N 66W | Footage: 460 FNL 475 FEL | | Proposed Depth/Form: | 12161 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1292 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 162, Top: 0 ft., Bottom: 1292 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8125 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 461, Top: 992 ft., Bottom: 8125 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12161 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 168, Top: 7825 ft., Bottom: 12161 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/13/2013 | | Spud Date: | 7/1/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 12185 ft. | Measured PB depth: | 12161 ft. | | True Vertical TD: | 7592 ft. | True Vertical PB depth: | 7592 ft. | | Top PZ Location: | Sec:14 Twp: 1N 66W | Footage: 528 FSL 471 FEL | | Bottom Hole Location: | Sec:14 Twp: 1N 66W | Footage: 475 FNL 465 FEL | | Log Types: | CBL, mwd | | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 62.64 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1406 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 488, Top: 0 ft., Bottom: 1406 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7896 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 1397 ft., Bottom: 7896 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12165 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 541, Top: 9896 ft., Bottom: 12165 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7257 ft. | | | | | NIOBRARA | 7275 ft. | | | | | FORT HAYS | 7746 ft. | | | | | CODELL | 7821 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 6/1/2024 Interval Top: 7916 ft. Interval Bottom: 12032 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/17/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/12/2013 | Treatment End Date: | 8/16/2013 | | Treatment Summary: | 28 stage Frac with 25452 bbls Slickwater, 44019 bbls Crosslink gel, 648 bbls additives, 70,119 bbls Total fluid, and 2808777 lbs 30/50 Ottowa Sand proppant. | | Total fluid used in treatment (bbls): | 70119 | Max pressure during treatment (psi): | 7916 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.92 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 2380 | | Fresh water used in treatment (bbls): | 69471 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2808777 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7480 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/24/2013 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 296 | | BBLS_OIL | 486 | | BTU_GAS | 48 | | CALC_BBLS_H2O | 296 | | CALC_BBLS_OIL | 486 | | CALC_GOR | 1290 | | CALC_MCF_GAS | 627 | | CASING_PRESS | 2007 | | GRAVITY_OIL | 1390 | | MCF_GAS | 627 | | TUBING_PRESS | 1554 |
| | Perforation Data: | | Interval Top: | 7916 ft. | # Of Holes: | 1008 | | Interval Bottom: | 12032 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 845 |
| Total Gas Produced (MCF) | 23551 |
| GOR | 27871 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.449 |
| Average MCFE per Day | 78.026 |
| Federal Financial Assurance | i | |
|
|