Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36822
Well Classification: OW Status: PA - 3/29/2019
Well Name/No:McPeek #4-8-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/29/2019
FacilityID:431853LocationID:422467
County:WELD #123Location:SESW 10 2N66W 6
Field:WATTENBERG - #90750Elevation:4988 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:452FSL  2481 FWLLat/Long: 40.146640 / -104.763890Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146660 / -104.763907Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/7/2013
End Date: 9/7/2013
Reported: 11/5/2013
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 3/29/2019             Measured TD: 8106 ft.    Vertical TD: 8069 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 3/29/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/18/2015
Proposed Top PZ Location:Sec:10 Twp: 2n 66w Footage: 48 FSL  2565 FWL
Bottom Hole Location:Sec:10 Twp: 2n 66w Footage: 61 FSL  2571 FWL
Proposed Depth/Form:8088 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:8/18/2013
Spud Date:8/14/2013Spud Date Is:ACTUAL
Measured TD:8106 ft.Measured PB depth:8060 ft.
True Vertical TD:8069 ft.True Vertical PB depth:8023 ft.
Top PZ Location:Sec:10 Twp: 2N 66WFootage: 48 FSL  2565 FWL
Bottom Hole Location:Sec:10 Twp: 2N 66WFootage: 61 FSL  2571 FWL
Log Types:Cement Bond Log High Resolution Induction, Compensated Density, Compensated Neutron
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8096 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 5170 ft., Bottom: 8096 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4555 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 3720 ft., Bottom: 4540 ft., Determination Method: CBL
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 4555 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 3720 ft., Bottom: 4540 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4531 ft.
NIOBRARA7215 ft.
CODELL7482 ft.
J SAND7931 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 3/29/2019                 Interval Top: 7960 ft.    Interval Bottom: 7985 ft.

 Completed Information for Formation J SAND
1st Production Date:10/11/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2013Treatment End Date:9/7/2013
Treatment Summary:Pioneer Wireline perforated J Sand 7960-7985 w/3 jspf - 75 holes Frac J Sand with 155,010# 30/50 and 153,930 gals SLF
Total fluid used in treatment (bbls):3691Max pressure during treatment (psi):3199
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1010
Fresh water used in treatment (bbls):3691Disposition method For flowback:DISPOSAL
Total proppant used (lbs):155010Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7960 ft.# Of Holes:75
Interval Bottom:7985 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/17/2013                Interval Top: 7483 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/7/2013Treatment End Date:9/7/2013
Treatment Summary:Set CFP @ 7550', perforate Codell Frac Codell with 150,210# 30/50 and 153,930 gals SLF
Total fluid used in treatment (bbls):3576Max pressure during treatment (psi):4609
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1010
Fresh water used in treatment (bbls):3576Disposition method For flowback:DISPOSAL
Total proppant used (lbs):150210Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7483 ft.# Of Holes:75
Interval Bottom:7500 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/20/2013                Interval Top: 7262 ft.    Interval Bottom: 7985 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/20/2013Treatment End Date:N/A
Treatment Summary:Drilled up CFPs to commingle the JSND-NBRR-CODL 9-18-2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7938 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 22
BTU_GAS 1303
CALC_BBLS_H2O 17
CALC_BBLS_OIL 22
CALC_GOR 10863
CALC_MCF_GAS 239
CASING_PRESS 959
GRAVITY_OIL 49
MCF_GAS 239
TUBING_PRESS 363
Perforation Data:
Interval Top:7262 ft.# Of Holes:234
Interval Bottom:7985 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 3/29/2019                 Interval Top: 7262 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7262 ft.# Of Holes:159
Interval Bottom:7500 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/17/2013                Interval Top: 7262 ft.    Interval Bottom: 7283 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/7/2013Treatment End Date:9/1/2013
Treatment Summary:Set CFP @7340', perforate Niobrara Frac Niobrara with 150,400# 30/50 and 153,804 gals SLF
Total fluid used in treatment (bbls):3581Max pressure during treatment (psi):4721
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1010
Fresh water used in treatment (bbls):3581Disposition method For flowback:DISPOSAL
Total proppant used (lbs):150400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7262 ft.# Of Holes:84
Interval Bottom:7283 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/29/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No