Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36821
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:McPeek #0-8-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:431852LocationID:422467
County:WELD #123Location:SESW 10 2N66W 6
Field:WATTENBERG - #90750Elevation:4988 ft.
Planned Location:422FSL  2455 FWLLat/Long: 40.146560 / -104.763980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146571 / -104.763996Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/5/2013
End Date: 9/5/2013
Reported: 11/1/2013
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2025             Measured TD: 8643 ft.    Vertical TD: 8070 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/18/2015
Proposed Top PZ Location:Sec:10 Twp: 2N 66W Footage: 16 FSL  49 FWL
Bottom Hole Location:Sec:10 Twp: 2N 66W Footage: 15 FSL  33 FWL
Proposed Depth/Form:8606 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 310, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8605 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 170, Top: 7553 ft., Bottom: 8605 ft.
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: , Top: 0 ft., Depth: 5356 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 90, Top: 4761 ft., Bottom: 5356 ft.

Wellbore Completed
Completion Date:8/13/2013
Spud Date:8/8/2013Spud Date Is:ACTUAL
Measured TD:8643 ft.Measured PB depth:8580 ft.
True Vertical TD:8070 ft.True Vertical PB depth:8007 ft.
Top PZ Location:Sec:10 Twp: 2N 66WFootage: 16 FSL  49 FWL
Bottom Hole Location:Sec:10 Twp: 2N 66WFootage: 15 FSL  33 FWL
Log Types:Cement Bond Log, gamma ray
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8633 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 4870 ft., Bottom: 8633 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4575 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 3880 ft., Bottom: 4575 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5011 ft.
NIOBRARA7759 ft.
CODELL8026 ft.
J SAND8477 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 10/1/2024                 Interval Top: 8497 ft.    Interval Bottom: 8522 ft.

 Completed Information for Formation J SAND
1st Production Date:10/11/2013Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2013Treatment End Date:9/5/2013
Treatment Summary:Pioneer Wireline perforated J Sand 8497-8522 w/ 3 jspf - 75 shots - 9.3.2013 Frac J Sand with 150,120# 30/50 and 148,008 gals SLF - 9.5.2013
Total fluid used in treatment (bbls):3524Max pressure during treatment (psi):4438
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1018
Fresh water used in treatment (bbls):3524Disposition method For flowback:DISPOSAL
Total proppant used (lbs):150120Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8497 ft.# Of Holes:75
Interval Bottom:8522 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/17/2013                Interval Top: 8028 ft.    Interval Bottom: 8045 ft.

 Completed Information for Formation CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2013Treatment End Date:9/5/2013
Treatment Summary:Set CFP @ 8120' perforate Codell Frac Codell with 150,120# 30/50 and 148,008 gals SLF
Total fluid used in treatment (bbls):3524Max pressure during treatment (psi):4642
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1018
Fresh water used in treatment (bbls):3524Disposition method For flowback:DISPOSAL
Total proppant used (lbs):150160Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8028 ft.# Of Holes:69
Interval Bottom:8045 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/17/2013                Interval Top: 7816 ft.    Interval Bottom: 8522 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/17/2013Treatment End Date:N/A
Treatment Summary:Drilled up CFPs to commingle the JSND-CODL-NBRR. 9.21.2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8477 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 27
BTU_GAS 1303
CALC_BBLS_H2O 46
CALC_BBLS_OIL 27
CALC_GOR 11481
CALC_MCF_GAS 310
CASING_PRESS 1396
GRAVITY_OIL 49
MCF_GAS 310
TUBING_PRESS 502
Perforation Data:
Interval Top:7816 ft.# Of Holes:208
Interval Bottom:8522 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 10/1/2024                 Interval Top: 7816 ft.    Interval Bottom: 8045 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7816 ft.# Of Holes:133
Interval Bottom:8045 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/17/2013                Interval Top: 7816 ft.    Interval Bottom: 7835 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2013Treatment End Date:9/5/2013
Treatment Summary:Set CFP @7916', perforate Niobrara Frac Niobrara with 152,700# 30/50 and 153,090 gals SLF
Total fluid used in treatment (bbls):3645Max pressure during treatment (psi):4868
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1018
Fresh water used in treatment (bbls):3645Disposition method For flowback:DISPOSAL
Total proppant used (lbs):152700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7816 ft.# Of Holes:64
Interval Bottom:7835 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)94
Total Gas Produced (MCF)1983
GOR21095
GOR DeterminationMCFE
Average BOE per Day1.186
Average MCFE per Day6.860

 Federal Financial Assurance  i 

 Tribal Well  i No