Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36821
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:McPeek #0-8-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:431852LocationID:422467
County:WELD #123Location:SESW 10 2N66W 6
Field:WATTENBERG - #90750Elevation:4988 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:422FSL  2455 FWLLat/Long: 40.146560 / -104.763980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146571 / -104.763996Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/5/2013
End Date: 9/5/2013
Reported: 11/1/2013
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2025             Measured TD: 8643 ft.    Vertical TD: 8070 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/18/2015
Proposed Top PZ Location:Sec:10 Twp: 2N 66W Footage: 16 FSL  49 FWL
Bottom Hole Location:Sec:10 Twp: 2N 66W Footage: 15 FSL  33 FWL
Proposed Depth/Form:8606 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 310, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8605 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 170, Top: 7553 ft., Bottom: 8605 ft.
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: , Top: 0 ft., Depth: 5356 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 90, Top: 4761 ft., Bottom: 5356 ft.

Wellbore Completed
Completion Date:8/13/2013
Spud Date:8/8/2013Spud Date Is:ACTUAL
Measured TD:8643 ft.Measured PB depth:8580 ft.
True Vertical TD:8070 ft.True Vertical PB depth:8007 ft.
Top PZ Location:Sec:10 Twp: 2N 66WFootage: 16 FSL  49 FWL
Bottom Hole Location:Sec:10 Twp: 2N 66WFootage: 15 FSL  33 FWL
Log Types:Cement Bond Log, gamma ray
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8633 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 4870 ft., Bottom: 8633 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4575 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 3880 ft., Bottom: 4575 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5011 ft.
NIOBRARA7759 ft.
CODELL8026 ft.
J SAND8477 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 10/1/2024                 Interval Top: 8497 ft.    Interval Bottom: 8522 ft.

 Completed Information for Formation J SAND
1st Production Date:10/11/2013Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2013Treatment End Date:9/5/2013
Treatment Summary:Pioneer Wireline perforated J Sand 8497-8522 w/ 3 jspf - 75 shots - 9.3.2013 Frac J Sand with 150,120# 30/50 and 148,008 gals SLF - 9.5.2013
Total fluid used in treatment (bbls):3524Max pressure during treatment (psi):4438
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1018
Fresh water used in treatment (bbls):3524Disposition method For flowback:DISPOSAL
Total proppant used (lbs):150120Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8497 ft.# Of Holes:75
Interval Bottom:8522 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/17/2013                Interval Top: 8028 ft.    Interval Bottom: 8045 ft.

 Completed Information for Formation CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2013Treatment End Date:9/5/2013
Treatment Summary:Set CFP @ 8120' perforate Codell Frac Codell with 150,120# 30/50 and 148,008 gals SLF
Total fluid used in treatment (bbls):3524Max pressure during treatment (psi):4642
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1018
Fresh water used in treatment (bbls):3524Disposition method For flowback:DISPOSAL
Total proppant used (lbs):150160Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8028 ft.# Of Holes:69
Interval Bottom:8045 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/17/2013                Interval Top: 7816 ft.    Interval Bottom: 8522 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/17/2013Treatment End Date:N/A
Treatment Summary:Drilled up CFPs to commingle the JSND-CODL-NBRR. 9.21.2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8477 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 27
BTU_GAS 1303
CALC_BBLS_H2O 46
CALC_BBLS_OIL 27
CALC_GOR 11481
CALC_MCF_GAS 310
CASING_PRESS 1396
GRAVITY_OIL 49
MCF_GAS 310
TUBING_PRESS 502
Perforation Data:
Interval Top:7816 ft.# Of Holes:208
Interval Bottom:8522 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 10/1/2024                 Interval Top: 7816 ft.    Interval Bottom: 8045 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/11/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7816 ft.# Of Holes:133
Interval Bottom:8045 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/17/2013                Interval Top: 7816 ft.    Interval Bottom: 7835 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2013Treatment End Date:9/5/2013
Treatment Summary:Set CFP @7916', perforate Niobrara Frac Niobrara with 152,700# 30/50 and 153,090 gals SLF
Total fluid used in treatment (bbls):3645Max pressure during treatment (psi):4868
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1018
Fresh water used in treatment (bbls):3645Disposition method For flowback:DISPOSAL
Total proppant used (lbs):152700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7816 ft.# Of Holes:64
Interval Bottom:7835 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
10/21/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/11/2024
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No