|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/28/2019 Measured TD: 8218 ft. Vertical TD: 8060 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/28/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/18/2015 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 35 FSL 1270 FWL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 39 FSL 1267 FWL | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8200 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 170, Top: 7148 ft., Bottom: 8200 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: , Top: 0 ft., Depth: 5033 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 90, Top: 4464 ft., Bottom: 5033 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/8/2013 | | Spud Date: | 8/4/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8218 ft. | Measured PB depth: | 8171 ft. | | True Vertical TD: | 8060 ft. | True Vertical PB depth: | 8013 ft. | | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 35 FSL 1270 FWL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 39 FSL 1267 FWL | | Log Types: | Cement Bond Log
High Resolution Induction, Compensated Density, Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 922 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 922 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8207 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 4490 ft., Bottom: 8207 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4623 ft. | | | | | NIOBRARA | 7343 ft. | | | | | CODELL | 7625 ft. | | | | | J SAND | 8056 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 4/26/2019 Interval Top: 8086 ft. Interval Bottom: 8111 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/11/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/3/2013 | Treatment End Date: | 9/4/2013 | | Treatment Summary: | Pioneer Wireline perforated J Sand - 8086-8111 w/ 3 jspf - 75 holes
Frac J Sand with 151,637# 30/50 and 155,442 gals SLF | | Total fluid used in treatment (bbls): | 3701 | Max pressure during treatment (psi): | 4120 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.67 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 975 | | Fresh water used in treatment (bbls): | 3701 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 151637 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8086 ft. | # Of Holes: | 75 | | Interval Bottom: | 8111 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/17/2013 Interval Top: 7627 ft. Interval Bottom: 7641 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/11/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/4/2013 | Treatment End Date: | 9/4/2013 | | Treatment Summary: | Set CFP @ 7706', perforate Codell
Frac Codell with 150,993# 30/50 and 166,026 gals SLF | | Total fluid used in treatment (bbls): | 3953 | Max pressure during treatment (psi): | 4538 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 975 | | Fresh water used in treatment (bbls): | 3953 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 150993 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7627 ft. | # Of Holes: | 69 | | Interval Bottom: | 7641 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/19/2013 Interval Top: 7391 ft. Interval Bottom: 8111 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/11/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/19/2013 | Treatment End Date: | N/A | | Treatment Summary: | Drilled up CFPs to commingle the JSND-CODL-NBRR. 9/22/2013 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8060 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/19/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 30 | | BTU_GAS | 1303 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 7567 | | CALC_MCF_GAS | 227 | | CASING_PRESS | 1107 | | GRAVITY_OIL | 49 | | MCF_GAS | 227 | | TUBING_PRESS | 382 |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 208 | | Interval Bottom: | 8111 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/26/2019 Interval Top: 7391 ft. Interval Bottom: 7641 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/11/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 133 | | Interval Bottom: | 7641 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/17/2013 Interval Top: 7391 ft. Interval Bottom: 7412 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/11/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/4/2013 | Treatment End Date: | 9/4/2013 | | Treatment Summary: | Set CFP @ 7460', perforate Niobrara
Frac Niobrara with 150,370# 30/50 and 153,594 gals SLF | | Total fluid used in treatment (bbls): | 3657 | Max pressure during treatment (psi): | 4312 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 975 | | Fresh water used in treatment (bbls): | 3657 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 150370 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7391 ft. | # Of Holes: | 64 | | Interval Bottom: | 7412 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/26/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|