Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36795
Well Classification: OW Status: SI - 1/1/2023
Well Name/No:HOWARD #30N-21HZX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2023
FacilityID:431812LocationID:317564
County:WELD #123Location:SESW 21 1N67W 6
Field:WATTENBERG - #90750Elevation:5025 ft.
Planned Location:371FSL  1521 FWLLat/Long: 40.030339 / -104.899553Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.030342 / -104.899553Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/29/2014
End Date: 2/19/2014
Reported: 4/3/2014
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 1/30/2023             Measured TD: 8097 ft.    Vertical TD: 7465 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 1/30/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:2/14/2015
Proposed Top PZ Location:Sec:21 Twp: 1N 67W Footage: 493 FSL  45 FWL
Bottom Hole Location:Sec:21 Twp: 1N 67W Footage: 781 FSL  48 FWL
Proposed Depth/Form:12219 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 926 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7808 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 728, Top: 0 ft., Bottom: 7808 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7025 ft., Depth: 12220 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Spud Date:6/14/2013Spud Date Is:ACTUAL
Measured TD:8097 ft.Measured PB depth:7769 ft.
True Vertical TD:7465 ft.True Vertical PB depth:7384 ft.
Top PZ Location:Sec:21 Twp: 1N 67WFootage: 493 FSL  45 FWL
Bottom Hole Location:Sec:21 Twp: 1N 67WFootage: 781 S  48 W
Log Types:This well was a sidetrack. All logs will be submitted with final form 5 "01".
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 926 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7808 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 773, Top: 746 ft., Bottom: 7808 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 7799 ft., Depth: 8097 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4837 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  TA - 1/30/2023                 Interval Top: 7805 ft.    Interval Bottom: 11956 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/24/2014Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7805 ft.# Of Holes:516
Interval Bottom:11956 ft.Hole Size:0.37 in.

Sidetrack #01             Wellbore Classification: OW             Status: SI - 1/1/2023             Measured TD: 12103 ft.    Vertical TD: 7462 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        SI - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2015
Proposed Top PZ Location:Sec:21 Twp: 1N 67W Footage: 651 FSL  50 FWL
Bottom Hole Location:Sec:21 Twp: 1N 67W Footage: 460 FNL  50 FWL
Proposed Depth/Form:12220 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 925 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 925 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7808 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 728, Top: 0 ft., Bottom: 7808 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7035 ft., Depth: 12220 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/12/2013
Spud Date:6/14/2013Spud Date Is:ACTUAL
Measured TD:12103 ft.Measured PB depth:11977 ft.
True Vertical TD:7462 ft.True Vertical PB depth:7464 ft.
Top PZ Location:Sec:21 Twp: 1N 67WFootage: 493 FSL  45 FWL
Bottom Hole Location:Sec:21 Twp: 1N 67WFootage: 486 N  39 W
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 926 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7808 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 773, Top: 746 ft., Bottom: 7808 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6895 ft., Depth: 12073 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 351, Top: 6895 ft., Bottom: 12073 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4837 ft.
SHARON SPRINGS7759 ft.
NIOBRARA7810 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 1/1/2023                  Interval Top: 7805 ft.    Interval Bottom: 11956 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/24/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/29/2014Treatment End Date:2/19/2014
Treatment Summary:21 stages: PERF AND FRAC FROM 7805-11956. 417 BBL ACID, 56,033 BBL CROSSLINK GEL, 7,433 BBL LINEAR GEL, 40,393 BBL SLICKWATER, 6,583 BBL WATER, 110,859 BBL TOTAL FLUID. 2,767,274# 40/70 OTTAWA/ST. PETERS SAND, 2,767,274# TOTAL SAND.
Total fluid used in treatment (bbls):110859Max pressure during treatment (psi):7829
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):417Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5942
Fresh water used in treatment (bbls):110443Disposition method For flowback:RECYCLE
Total proppant used (lbs):2767274Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 118
BTU_GAS 1118
CALC_BBLS_OIL 118
CALC_GOR 2314
CALC_MCF_GAS 273
CASING_PRESS 1300
GRAVITY_OIL 48
MCF_GAS 273
Perforation Data:
Interval Top:7805 ft.# Of Holes:516
Interval Bottom:11956 ft.Hole Size:0.37 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/31/2022
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No