|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2025 Measured TD: 12074 ft. Vertical TD: 7458 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/13/2015 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 740 FNL 854 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 460 FSL 850 FEL | | Proposed Depth/Form: | 12061 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 827 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 216, Top: 0 ft., Bottom: 827 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7974 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 979, Top: 4085 ft., Bottom: 7974 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12061 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 362, Top: 7674 ft., Bottom: 12061 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/8/2013 | | Spud Date: | 6/27/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 12074 ft. | Measured PB depth: | 12062 ft. | | True Vertical TD: | 7458 ft. | True Vertical PB depth: | 7446 ft. | | Top PZ Location: | Sec:10 Twp: 2n 66w | Footage: 575 FNL 984 FEL | | Bottom Hole Location: | Sec:10 Twp: 2n 66w | Footage: 488 FSL 1011 FEL | | Log Types: | CBL .pdf | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 84.0 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 93 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1013 ft., Weight: 40.0 , Citings Type: ACTUAL | | Cement: | Sacks: 413, Top: 0 ft., Bottom: 1013 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7845 ft., Weight: 26.0 , Citings Type: ACTUAL | | Cement: | Sacks: 626, Top: 0 ft., Bottom: 7855 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12064 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 6845 ft., Bottom: 12064 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7185 ft. | | | | | NIOBRARA | 7269 ft. | | | | | FORT HAYS | 7679 ft. | | | | | CODELL | 7756 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 11/1/2024 Interval Top: 8013 ft. Interval Bottom: 11818 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/2/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/25/2013 | Treatment End Date: | 8/31/2013 | | Treatment Summary: | Frac with 20024 bbls Slickwater, 50913 bbls Crosslink gel, 631 bbls additives, 667 bbls 15% HCL Acid, 72235 bbls Total fluid. Stg 1-15 used 30/50 Ottawa Sand, Stg 26-28 used 40/70 White Sand. | | Total fluid used in treatment (bbls): | 72235 | Max pressure during treatment (psi): | 9713 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 667 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1650 | | Fresh water used in treatment (bbls): | 70937 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2807960 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7560 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/19/2013 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 288 | | BBLS_OIL | 373 | | BTU_GAS | 1307 | | CALC_BBLS_H2O | 288 | | CALC_BBLS_OIL | 373 | | CALC_GOR | 1292 | | CALC_MCF_GAS | 482 | | CASING_PRESS | 2499 | | GRAVITY_OIL | 50 | | MCF_GAS | 482 | | TUBING_PRESS | 910 |
| | Perforation Data: | | Interval Top: | 8013 ft. | # Of Holes: | 936 | | Interval Bottom: | 11818 ft. | Hole Size: | 0.5625 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 10/31/2024 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|