|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2024 Measured TD: 10808 ft. Vertical TD: 6470 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/30/2015 | Prop Depth/Form: | 10845 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: All | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6906 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 470, Top: 0 ft., Bottom: 6906 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6756 ft., Depth: 10845 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 0, Top: 0 ft., Bottom: 0 ft. |
| | |
Wellbore Completed | Completion Date: | 3/7/2013 | Spud Date: | 2/28/2013 | Spud Date Is: | ACTUAL | Measured TD: | 10808 ft. | Measured PB depth: | 10792 ft. | True Vertical TD: | 6470 ft. | True Vertical PB depth: | 6454 ft. | Top PZ Location: | Sec:26 Twp: 9N 61W | Footage: 637 FSL 889 FEL | Depth | Bottom Hole Location: | Sec:26 Twp: 9N 61W | Footage: 660 FSL 660 FWL | Depth | Log Types: | CBL SENT 6/20/13, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 843 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 422, Top: 0 ft., Bottom: 843 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6909 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 580, Top: 1335 ft., Bottom: 6909 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6821 ft., Depth: 10793 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2675 ft. | | | | PARKMAN | 3566 ft. | | | | SUSSEX | 4195 ft. | | | | SHANNON | 4915 ft. | | | | TEEPEE BUTTES | 5799 ft. | | | | NIOBRARA | 6607 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2024 Interval Top: 7060 ft. Interval Bottom: 10710 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/9/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/12/2013 | Treatment End Date: | 4/25/2013 | Treatment Summary: | 4/12/13 FRAC'D 10709-10710' W/140235 GAL SILVERSTIM AND SLICK WATER AND 144336# OTTAWA SAND
4/21/13 FRAC'D 10462-10463' W/207930 GAL SILVERSTIM, LINEAR GEL 25# AND SLICK WATER AND 190018# OTTAWA SAND
4/25/13 FRAC'D 7060-10278' W/2424270 GAL SILVERSTIM AND SLICK WATER AND 3646200# OTTAWA SAND | Total fluid used in treatment (bbls): | 66010 | Max pressure during treatment (psi): | 4577 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 20 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | 4373 | Total flowback volume recovered (bbls): | 12791 | Fresh water used in treatment (bbls): | 61637 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 3902447 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PRESSURE |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6837 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/13/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 299 | BBLS_OIL | 155 | CALC_BBLS_H2O | 299 | CALC_BBLS_OIL | 155 | CALC_GOR | 490 | CALC_MCF_GAS | 76 | CASING_PRESS | 889 | GRAVITY_OIL | 36 | MCF_GAS | 76 | TUBING_PRESS | 193 |
| Perforation Data: | Interval Top: | 7060 ft. | # Of Holes: | 0 | Interval Bottom: | 10710 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5151 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 14.011 |
Average MCFE per Day | 81.262 |
Federal Financial Assurance | i | |
|
|