Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36663
Well Classification: OW Status: PA - 11/21/2022
Well Name/No:Hunt #LF18-62HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/21/2022
FacilityID:431547LocationID:431544
County:WELD #123Location:NENE 19 8N60W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4940 ft.
Planned Location:450FNL  275 FELLat/Long: 40.653797 / -104.126003Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.653803 / -104.126016Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/21/2013
End Date: 5/22/2013
Reported: 9/6/2013
Days to report: 107
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/21/2022             Measured TD: 10765 ft.    Vertical TD: 6492 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/21/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/30/2015
Prop Depth/Form:10758 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: Sect 18 All
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6882 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 470, Top: , Bottom: 6882 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6732 ft., Depth: 10758 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/19/2013
Spud Date:4/7/2013Spud Date Is:ACTUAL
Measured TD:10765 ft.Measured PB depth:10749 ft.
True Vertical TD:6492 ft.True Vertical PB depth:6492 ft.
Top PZ Location:Sec:18 Twp: 8N 60WFootage: 655 FSL  916 FELDepth
Bottom Hole Location:Sec:18 Twp: 8N 60WFootage: 660 FSL  665 FWLDepth
Log Types:CBL, MUD,GR
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 98 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 16 ft., Bottom: 98 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 623 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 422, Top: 16 ft., Bottom: 622 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6999 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 640 ft., Bottom: 6999 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6938 ft., Depth: 10750 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2648 ft.
PARKMAN3610 ft.
SUSSEX4564 ft.
SHANNON4964 ft.
TEEPEE BUTTES5696 ft.
SHARON SPRINGS6206 ft.
NIOBRARA6234 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 11/21/2022                Interval Top: 7100 ft.    Interval Bottom: 10667 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/6/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2013Treatment End Date:5/21/2013
Treatment Summary:FRAC'D W/ 2354415 GAL VISTAR AND SILCK WATER, 446# 40/70 SAND AND 3553872# OTTAWA SAND
Total fluid used in treatment (bbls):56058Max pressure during treatment (psi):6726
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):3845Total flowback volume recovered (bbls):9705
Fresh water used in treatment (bbls):52213Disposition method For flowback:RECYCLE
Total proppant used (lbs):3554318Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:2.375 in.Tubing Setting Depth:6949 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/12/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 255
BBLS_OIL 287
CALC_BBLS_H2O 255
CALC_BBLS_OIL 287
CALC_GOR 491
CALC_MCF_GAS 141
CASING_PRESS 922
GRAVITY_OIL 42
MCF_GAS 141
TUBING_PRESS 282
Perforation Data:
Interval Top:7100 ft.# Of Holes:0
Interval Bottom:10667 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No