|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/22/2019 Measured TD: 8370 ft. Vertical TD: 7839 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/22/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/24/2015 | | Proposed Top PZ Location: | Sec:18 Twp: 3N 68W | Footage: 1974 FNL 1942 FWL | | Bottom Hole Location: | Sec:18 Twp: 3N 68W | Footage: 1975 FNL 1920 FWL | | Proposed Depth/Form: | 8358 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 640 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 640 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8358 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 7263 ft., Bottom: 8358 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/6/2013 | | Spud Date: | 2/1/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8370 ft. | Measured PB depth: | 8318 ft. | | True Vertical TD: | 7839 ft. | True Vertical PB depth: | 7787 ft. | | Top PZ Location: | Sec:18 Twp: 3N 68W | Footage: 1979 FNL 1940 FWL | | Bottom Hole Location: | Sec:18 Twp: 3N 68W | Footage: 1975 FNL 1920 FWL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Log Types: | Triple Combo, Sonic, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 673 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 673 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8358 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 715, Top: 2924 ft., Bottom: 8358 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 673 ft., Sacks: 40, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4348 ft. | | | | | NIOBRARA | 7471 ft. | | | | | FORT HAYS | 7730 ft. | | | | | CODELL | 7748 ft. | | | | | J SAND | 8211 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/11/2019 Interval Top: 8213 ft. Interval Bottom: 8255 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/23/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/15/2013 | Treatment End Date: | 11/15/2013 | | Treatment Summary: | Frac with 355 bbls Slickwater, 1190 bbls Crosslink gel, 1545 bbls Total Fluid, 121929 Pounds of Sand. | | Total fluid used in treatment (bbls): | 1545 | Max pressure during treatment (psi): | 4636 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 950 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 121929 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8213 ft. | # Of Holes: | 69 | | Interval Bottom: | 8255 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/3/2015 Interval Top: 7750 ft. Interval Bottom: 7770 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/23/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/15/2013 | Treatment End Date: | 11/15/2013 | | Treatment Summary: | Frac Codell with 406 bbls Slickwater, 1155 bbls Crosslink Gel, 1561 bbls Total Fluid, 101487 Pounds of Sand. | | Total fluid used in treatment (bbls): | 1561 | Max pressure during treatment (psi): | 4452 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 950 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 101487 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7750 ft. | # Of Holes: | 60 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/29/2013 Interval Top: 7545 ft. Interval Bottom: 8255 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/23/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8172 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/29/2013 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 89 | | BBLS_OIL | 108 | | BTU_GAS | 1379 | | CALC_BBLS_H2O | 89 | | CALC_BBLS_OIL | 108 | | CALC_GOR | 2102 | | CALC_MCF_GAS | 227 | | CASING_PRESS | 1706 | | GRAVITY_OIL | 45 | | MCF_GAS | 227 | | TUBING_PRESS | 836 |
| | Perforation Data: | | Interval Top: | 7545 ft. | # Of Holes: | 159 | | Interval Bottom: | 8255 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/11/2019 Interval Top: 7545 ft. Interval Bottom: 7770 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/23/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7545 ft. | # Of Holes: | 90 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/3/2015 Interval Top: 7545 ft. Interval Bottom: 7630 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/23/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/15/2013 | Treatment End Date: | 11/15/2013 | | Treatment Summary: | Frac with 24 bbls Acid, 405 bbls Slickwater, 1978 Crosslink gel, 2407 bbls Total Fluid, 168690 Pounds of Sand. | | Total fluid used in treatment (bbls): | 2407 | Max pressure during treatment (psi): | 4440 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 960 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 168690 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7545 ft. | # Of Holes: | 30 | | Interval Bottom: | 7630 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/11/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|