Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36594
Well Classification: OW Status: PA - 9/3/2024
Well Name/No:Land JG #31-24D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/3/2024
FacilityID:431403LocationID:431392
Municipality/County:HUDSON / WELD #123Location:LOT2 31 2N64W 6
Field:WATTENBERG - #90750Elevation:4933 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:248FSL  929 FWLLat/Long: 40.088156 / -104.599353Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.088158 / -104.599356Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/12/2013
End Date: 4/12/2013
Reported: 5/16/2013
Days to report: 34
Disclosure: Sidetrack #00
Start Date: 12/11/2013
End Date: 12/11/2013
Reported: 5/13/2014
Days to report: 153
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/3/2024             Measured TD: 7433 ft.    Vertical TD: 7315 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/3/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/16/2015
Proposed Top PZ Location:Sec:31 Twp: 2N 64W Footage: 670 FSL  1795 FWL
Bottom Hole Location:Sec:31 Twp: 2N 64W Footage: 670 FSL  1795 FWL
Proposed Depth/Form:7474 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2SW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1001 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 463, Top: 0 ft., Bottom: 1001 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7474 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 3898 ft., Bottom: 7474 ft.

Wellbore Completed
Completion Date:2/27/2013
Spud Date:2/21/2013Spud Date Is:ACTUAL
Measured TD:7433 ft.Measured PB depth:7389 ft.
True Vertical TD:7315 ft.True Vertical PB depth:7273 ft.
Top PZ Location:Sec:31 Twp: 2N 64WFootage: 679 FSL  1831 FWL
Bottom Hole Location:Sec:31 Twp: 2N 64WFootage: 679 FSL  1842 FWL
Log Types:CBL, Composite
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1025 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1025 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7402 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 2528 ft., Bottom: 7402 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4153 ft.4275 ft.NN
SUSSEX4638 ft.4744 ft.NN
SHANNON5282 ft.5363 ft.NN
SHARON SPRINGS6830 ft.NN
NIOBRARA6939 ft.NN
FORT HAYS7246 ft.NN
CODELL7268 ft.NN
CARLILE7283 ft.NN
GREENHORN7334 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/13/2020                Interval Top: 7283 ft.    Interval Bottom: 7285 ft.

 Completed Information for Formation CARLILE
1st Production Date:7/9/2013Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7283 ft.# Of Holes:12
Interval Bottom:7285 ft.Hole Size:0.42 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  CM - 7/14/2013                 Interval Top: 7271 ft.    Interval Bottom: 7285 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:7/9/2013Choke Size: 
Formation Name:CODELL-CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/12/2013Treatment End Date:4/12/2013
Treatment Summary:190,560 # 20/40 Sand; 2,827 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):2827Max pressure during treatment (psi):3235
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):958
Fresh water used in treatment (bbls):2827Disposition method For flowback:DISPOSAL
Total proppant used (lbs):190560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/14/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 51
BTU_GAS 1386
CALC_BBLS_H2O 10
CALC_BBLS_OIL 51
CALC_GOR 39
CALC_MCF_GAS 2
CASING_PRESS 1475
GRAVITY_OIL 399
MCF_GAS 2
TUBING_PRESS 1350
Perforation Data:
Interval Top:7271 ft.# Of Holes:56
Interval Bottom:7285 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/13/2020                Interval Top: 7271 ft.    Interval Bottom: 7282 ft.

 Completed Information for Formation CODELL
1st Production Date:7/9/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7271 ft.# Of Holes:44
Interval Bottom:7282 ft.Hole Size:0.42 in.

Formation NBCDCL                 Formation Classification:  OW                 Status:  AB - 9/3/2024                  Interval Top: 7040 ft.    Interval Bottom: 7285 ft.

 Completed Information for Formation NIOBRARA-CODELL-CARLILE
1st Production Date:12/30/2013Choke Size: 
Formation Name:NIOBRARA-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBCDCL.
Perforation Data:
Interval Top:7040 ft.# Of Holes:109
Interval Bottom:7285 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/30/2013                Interval Top: 7040 ft.    Interval Bottom: 7156 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/30/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/11/2013Treatment End Date:12/11/2013
Treatment Summary:24 bbls 15% HCL Acid; 221,017# 40/70 Sand; 4000 # 20/40 Sand; 7791 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):7815Max pressure during treatment (psi):3112
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1208
Fresh water used in treatment (bbls):7791Disposition method For flowback:DISPOSAL
Total proppant used (lbs):225017Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7255 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/30/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 36
BTU_GAS 1386
CALC_BBLS_H2O 3
CALC_BBLS_OIL 36
CASING_PRESS 1250
GRAVITY_OIL 43
TUBING_PRESS 200
Perforation Data:
Interval Top:7040 ft.# Of Holes:63
Interval Bottom:7156 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/03/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
02/13/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No