Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36571
Well Classification: OW Status: PR - 12/7/2013
Well Name/No:JELTS #16N-19HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/7/2013
FacilityID:431356LocationID:431353
Municipality/County:DACONO / WELD #123Location:NENE 19 1N67W 6
Field:WATTENBERG - #90750Elevation:5158 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:275FNL  938 FELLat/Long: 40.043097 / -104.927462Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.043099 / -104.927466Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/2/2013
End Date: 11/7/2013
Reported: 12/31/2013
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/7/2013             Measured TD: 12105 ft.    Vertical TD: 7689 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/7/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/10/2015
Proposed Top PZ Location:Sec:19 Twp: 1N 67W Footage: 631 FNL  670 FEL
Bottom Hole Location:Sec:19 Twp: 1N 67W Footage: 460 FSL  670 FEL
Proposed Depth/Form:12153 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7953 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 780, Top: , Bottom: 7953 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6952 ft., Depth: 12143 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/26/2013
Spud Date:5/14/2013Spud Date Is:ACTUAL
Measured TD:12105 ft.Measured PB depth:12032 ft.
True Vertical TD:7689 ft.True Vertical PB depth:7685 ft.
Top PZ Location:Sec:19 Twp: 1N 67WFootage: 699 FNL  677 FEL
Bottom Hole Location:Sec:19 Twp: 1N 67WFootage: 491 FSL  700 FEL
Log Types:CBL,GR,RES,MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 938 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 537, Top: 0 ft., Bottom: 938 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8009 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 806, Top: 404 ft., Bottom: 8009 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6905 ft., Depth: 12080 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 418, Top: 6906 ft., Bottom: 12080 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7599 ft.
NIOBRARA7608 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2025                  Interval Top: 8036 ft.    Interval Bottom: 11967 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/4/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/2/2013Treatment End Date:11/7/2013
Treatment Summary:"PERF AND FRAC FROM 8036-11967. 80930 BBL WATER ,80930 BBL TOTAL FLUID 2147218# 40/70 OTTAWA/ST. PETERS SAND,2147218# TOTAL SAND.
Total fluid used in treatment (bbls):80930Max pressure during treatment (psi):7743
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):8307Total flowback volume recovered (bbls):9408
Fresh water used in treatment (bbls):72623Disposition method For flowback:RECYCLE
Total proppant used (lbs):2147218Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 51
BTU_GAS 1328
CALC_BBLS_H2O 2
CALC_BBLS_OIL 51
CALC_GOR 3294
CALC_MCF_GAS 168
CASING_PRESS 1550
GRAVITY_OIL 48
MCF_GAS 168
Perforation Data:
Interval Top:8036 ft.# Of Holes:720
Interval Bottom:11967 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)927
Total Gas Produced (MCF)25011
GOR26980
GOR DeterminationMCFE
Average BOE per Day14.319
Average MCFE per Day83.036

 Federal Financial Assurance  i 

 Tribal Well  i No