|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2023 Measured TD: 17000 ft. Vertical TD: 6676 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/3/2015 | Prop Depth/Form: | 16858 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 717, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 0 ft., Bottom: 550 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6986 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 470, Top: , Bottom: 6986 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6836 ft., Depth: 16858 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 3/13/2013 | Spud Date: | 2/28/2013 | Spud Date Is: | ACTUAL | Measured TD: | 17000 ft. | Measured PB depth: | 17000 ft. | True Vertical TD: | 6676 ft. | True Vertical PB depth: | 6676 ft. | Top PZ Location: | Sec:35 Twp: 6N 64W | Footage: 69 FSL 823 FEL | Depth | Bottom Hole Location: | Sec:34 Twp: 6N 64W | Footage: 39 FSL 530 FWL | Depth | Log Types: | CBL, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.05 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 633 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 392, Top: 0 ft., Bottom: 633 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7022 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 604, Top: 1110 ft., Bottom: 7022 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6888 ft., Depth: 16990 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2332 ft. | | | | PARKMAN | 3468 ft. | | | | SUSSEX | 4214 ft. | | | | SHANNON | 4816 ft. | | | | TEEPEE BUTTES | 5870 ft. | | | | NIOBRARA | 6637 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 6/1/2023 Interval Top: 7841 ft. Interval Bottom: 16370 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/4/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/4/2013 | Treatment End Date: | 5/5/2013 | Treatment Summary: | 5/4/2013 FRAC'D 16369-16370 W/102050 GAL SILVERSTIM AND SLICK WATER AND 2077# OTTAWA SAND.
5/5/2013 FRAC'D 7841-16370 W/ 6734514 GAL SILVERSTIM AND SLICK WATER AND 9611517# OTTAWA SAND | Total fluid used in treatment (bbls): | 162775 | Max pressure during treatment (psi): | 7884 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 36 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 10670 | Total flowback volume recovered (bbls): | 6777 | Fresh water used in treatment (bbls): | 152105 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 9613594 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 313 | BBLS_OIL | 414 | BTU_GAS | 1282 | CALC_BBLS_H2O | 313 | CALC_BBLS_OIL | 414 | CALC_GOR | 1809 | CALC_MCF_GAS | 749 | CASING_PRESS | 1800 | GRAVITY_OIL | 41 | MCF_GAS | 749 |
| Perforation Data: | Interval Top: | 7841 ft. | # Of Holes: | 38 | Interval Bottom: | 16370 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 09/30/2024 |
Defined Inactive (SI ) | Y | Defined Inactive 05/31/2023 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|