Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36527
Well Classification: OW Status: PR - 9/10/2014
Well Name/No:Billings #2E-18H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/10/2014
FacilityID:431276LocationID:431277
County:WELD #123Location:NWNW 18 3N68W 6
Field:WATTENBERG - #90750Elevation:5197 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1277FNL  275 FWLLat/Long: 40.229280 / -105.054130Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.229303 / -105.054135Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/9/2014
End Date: 7/23/2014
Reported: 9/17/2014
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/10/2014             Measured TD: 14125 ft.    Vertical TD: 7164 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/10/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/30/2014
Proposed Top PZ Location:Sec:18 Twp: 3N 68W Footage: 1382 FNL  706 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68W Footage: 1431 FNL  2066 FWL
Proposed Depth/Form:14031 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Formation And Spacing:Code: SHSP , Formation: SHARON SPRINGS , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7323 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 894, Top: 500 ft., Bottom: 7323 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14031 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 576, Top: 7023 ft., Bottom: 14031 ft.

Wellbore Completed
Completion Date:3/13/2014
Spud Date:1/12/2014Spud Date Is:ACTUAL
Measured TD:14125 ft.Measured PB depth:13930 ft.
True Vertical TD:7164 ft.True Vertical PB depth:7181 ft.
Top PZ Location:Sec:18 Twp: 3N 68WFootage: 1382 FNL  706 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68WFootage: 1431 FNL  2066 FWL
Log Types:CBL, MWD, (Triple Combo on 123-36620)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 116 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 116 ft., Bottom: 116 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 816 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 376, Top: 0 ft., Bottom: 840 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7486 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 654, Top: 400 ft., Bottom: 7505 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14057 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 557, Top: 5047 ft., Bottom: 14125 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX3916 ft.
SHANNON4369 ft.
TEEPEE BUTTES5898 ft.
SHARON SPRINGS6894 ft.
NIOBRARA6980 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/10/2014                 Interval Top: 7502 ft.    Interval Bottom: 14006 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/3/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/9/2014Treatment End Date:7/23/2014
Treatment Summary:Stages 1-44 were treated with 239,743 bbls of total fluids, 211992 bbls fresh water, 881 bbls of HCL 15%, and 2,086,980 lbs of 40/70 sand proppant.
Total fluid used in treatment (bbls):239743Max pressure during treatment (psi):8788
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:44
Total acid used in treatment (bbls):881Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):26870Total flowback volume recovered (bbls):3220
Fresh water used in treatment (bbls):211992Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2086980Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7205 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/10/2014Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 360
BBLS_OIL 73
BTU_GAS 1298
CALC_BBLS_H2O 360
CALC_BBLS_OIL 73
CALC_GOR 4986
CALC_MCF_GAS 364
CASING_PRESS 2456
GRAVITY_OIL 50
MCF_GAS 364
TUBING_PRESS 1059
Perforation Data:
Interval Top:7502 ft.# Of Holes:972
Interval Bottom:14006 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1251
Total Gas Produced (MCF)43719
GOR34947
GOR DeterminationMCFE
Average BOE per Day24.111
Average MCFE per Day139.855

 Federal Financial Assurance  i 

 Tribal Well  i No