Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36464
Well Classification: OW Status: PR - 5/3/2020
Well Name/No:BADGER #11C-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2020
FacilityID:431181LocationID:431161
County:WELD #123Location:NENW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5151 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:383FNL  1493 FWLLat/Long: 40.057366 / -104.993882Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057367 / -104.993881Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/7/2020
End Date: 2/18/2020
Reported: 4/13/2020
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/3/2020             Measured TD: 16279 ft.    Vertical TD: 7887 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/3/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Proposed Top PZ Location:Sec:15 Twp: 1N 68W Footage: 449 FNL  2284 FWL
Bottom Hole Location:Sec:3 Twp: 1N 68W Footage: 2175 FSL  2260 FWL
Proposed Depth/Form:16318 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1226 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1226 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8302 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 880, Top: 0 ft., Bottom: 8302 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7302 ft., Depth: 16318 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/18/2015
Spud Date:10/17/2014Spud Date Is:ACTUAL
Measured TD:16279 ft.Measured PB depth:16226 ft.
True Vertical TD:7887 ft.True Vertical PB depth:7887 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 449 FNL  2284 FWL
Bottom Hole Location:Sec:3 Twp: 1N 68WFootage: 2175 FSL  2260 FWL
Log Types:CBL, MWD/LWD, Mud
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1271 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 483, Top: 0 ft., Bottom: 1271 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8332 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 0 ft., Bottom: 8332 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7283 ft., Depth: 16275 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 7283 ft., Bottom: 16275 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4814 ft.
SHARON SPRINGS7580 ft.
NIOBRARA7618 ft.
FORT HAYS8180 ft.
CODELL8323 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 13327 ft.    Interval Bottom: 14036 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:13327-14036
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13327 ft.# Of Holes:264
Interval Bottom:14036 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/21/2020                 Interval Top: 12509 ft.    Interval Bottom: 12579 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:12509-12579
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12509 ft.# Of Holes:264
Interval Bottom:12579 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 12502 ft.    Interval Bottom: 13327 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:12502-12509, 12579-13327
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12502 ft.# Of Holes:264
Interval Bottom:13327 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 8354 ft.    Interval Bottom: 16194 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:8354-12502, 14036-16194
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8354 ft.# Of Holes:264
Interval Bottom:16194 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/3/2020                  Interval Top: 8354 ft.    Interval Bottom: 16194 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/7/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/7/2020Treatment End Date:2/18/2020
Treatment Summary:PERF FROM 8354-16194 262 BBLS 15% HCL ACID, 1,195 BBLS PUMP DOWN, 82,440 BBLS SLICKWATER, 83,897 BBLS TOTAL FLUID, 2,430,900 LBS WHITE 30/50 OTTAWA/ST. PETERS, 2,430,900 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):83897Max pressure during treatment (psi):7742
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):262Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):450Total flowback volume recovered (bbls):5615
Fresh water used in treatment (bbls):83185Disposition method For flowback:RECYCLE
Total proppant used (lbs):2430900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7824 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 155
BBLS_OIL 297
BTU_GAS 1279
CALC_BBLS_H2O 155
CALC_BBLS_OIL 297
CALC_GOR 1128
CALC_MCF_GAS 335
CASING_PRESS 2400
GRAVITY_OIL 47
MCF_GAS 335
TUBING_PRESS 1900
Perforation Data:
Interval Top:8354 ft.# Of Holes:264
Interval Bottom:16194 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6844
Total Gas Produced (MCF)89042
GOR13010
GOR DeterminationBOE
Average BOE per Day60.688
Average MCFE per Day352.007

 Federal Financial Assurance  i 

 Tribal Well  i No