Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36454
Well Classification: OW Status: PR - 3/1/2020
Well Name/No:BUFFALO #35C-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2020
FacilityID:431171LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5159 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:393FNL  983 FWLLat/Long: 40.057341 / -104.995704Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057340 / -104.995704Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/27/2020
End Date: 3/1/2020
Reported: 4/13/2020
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2020             Measured TD: 12427 ft.    Vertical TD: 7914 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Proposed Top PZ Location:Sec:15 Twp: 1N 68W Footage: 690 FNL  1190 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68W Footage: 483 FSL  1245 FWL
Proposed Depth/Form:12436 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1239 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1239 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8238 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8238 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7238 ft., Depth: 12436 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/6/2015
Spud Date:10/29/2014Spud Date Is:ACTUAL
Measured TD:12427 ft.Measured PB depth:12370 ft.
True Vertical TD:7914 ft.True Vertical PB depth:7914 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 690 FNL  1190 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68WFootage: 483 FSL  1245 FWL
Log Types:CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1307 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 809, Top: 0 ft., Bottom: 1307 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8288 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 8288 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7301 ft., Depth: 12418 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 7301 ft., Bottom: 12418 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4789 ft.
SHARON SPRINGS7579 ft.
NIOBRARA7627 ft.
FORT HAYS8135 ft.
CODELL8213 ft.
CARLILE9580 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/21/2020                 Interval Top: 11399 ft.    Interval Bottom: 11440 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:11399-11440
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11399 ft.# Of Holes:240
Interval Bottom:11440 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 9580 ft.    Interval Bottom: 9769 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:9580-9769
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9580 ft.# Of Holes:240
Interval Bottom:9769 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/21/2020                 Interval Top: 8307 ft.    Interval Bottom: 12282 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/26/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2020Treatment End Date:3/1/2020
Treatment Summary:PERF FROM 8307-12282 238 BBLS 15% HCL ACID, 958 BBLS PUMP DOWN, 73,279 BBLS SLICKWATER, 74,475 BBLS TOTAL FLUID. 2,208,800 LBS WHITE 30/50 OTTAWA/ST. PETERS, 2,208,800 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):74475Max pressure during treatment (psi):7718
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):238Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):760Total flowback volume recovered (bbls):4325
Fresh water used in treatment (bbls):73477Disposition method For flowback:RECYCLE
Total proppant used (lbs):2208800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7840 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 400
BBLS_OIL 276
BTU_GAS 1279
CALC_BBLS_H2O 400
CALC_BBLS_OIL 276
CALC_GOR 2667
CALC_MCF_GAS 736
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 736
TUBING_PRESS 2500
Perforation Data:
Interval Top:8307 ft.# Of Holes:240
Interval Bottom:12282 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/21/2020                 Interval Top: 8307 ft.    Interval Bottom: 12282 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/21/2020Treatment End Date:N/A
Treatment Summary:8307-9580, 9769-11399, 11440-12282
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8307 ft.# Of Holes:240
Interval Bottom:12282 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4004
Total Gas Produced (MCF)56851
GOR14198
GOR DeterminationBOE
Average BOE per Day37.802
Average MCFE per Day219.263

 Federal Financial Assurance  i 

 Tribal Well  i No