Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36451
Well Classification: OW Status: PR - 5/3/2020
Well Name/No:BUFFALO #14C-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2020
FacilityID:431168LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:5133 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:388FNL  1199 FWLLat/Long: 40.057353 / -104.994847Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057353 / -104.994848Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/19/2020
End Date: 2/25/2020
Reported: 4/13/2020
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/3/2020             Measured TD: 12447 ft.    Vertical TD: 7914 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/3/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Proposed Top PZ Location:Sec:15 Twp: 1N 68W Footage: 688 FNL  1845 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68W Footage: 485 FSL  1910 FWL
Proposed Depth/Form:12461 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1233 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1233 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8261 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8261 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7261 ft., Depth: 12461 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/26/2015
Spud Date:10/23/2014Spud Date Is:ACTUAL
Measured TD:12447 ft.Measured PB depth:12343 ft.
True Vertical TD:7914 ft.True Vertical PB depth:7913 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 688 FNL  1843 FWL
Bottom Hole Location:Sec:15 Twp: 1N 68WFootage: 485 FSL  1910 FWL
Log Types:CBL, MWD/LWD, Mud
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1301 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 497, Top: 0 ft., Bottom: 1301 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8337 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 8337 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7230 ft., Depth: 12437 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 7230 ft., Bottom: 12447 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4803 ft.
SHARON SPRINGS7560 ft.
NIOBRARA7603 ft.
FORT HAYS8222 ft.
CODELL8332 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/9/2020                  Interval Top: 9152 ft.    Interval Bottom: 10767 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/9/2020Treatment End Date:N/A
Treatment Summary:9152-9196, 10252-10767
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9152 ft.# Of Holes:240
Interval Bottom:10767 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 5/3/2020                  Interval Top: 8357 ft.    Interval Bottom: 12311 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/7/2020Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/19/2020Treatment End Date:2/25/2020
Treatment Summary:PERF FROM 8357-12311 233 BBLS 15% HCL ACID, 1,127 BBLS PUMP DOWN, 71,326 BBLS SLICKWATER, 72,686 BBLS TOTAL FLUID. 2,136,490 BBLS WHITE 30/50 OTTAWA/ST. PETERS, 2,136,490 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):72686Max pressure during treatment (psi):7663
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):233Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):2793
Fresh water used in treatment (bbls):72153Disposition method For flowback:RECYCLE
Total proppant used (lbs):2136490Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7862 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 149
BBLS_OIL 227
BTU_GAS 1279
CALC_BBLS_H2O 149
CALC_BBLS_OIL 227
CALC_GOR 2203
CALC_MCF_GAS 500
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 500
TUBING_PRESS 1800
Perforation Data:
Interval Top:8357 ft.# Of Holes:240
Interval Bottom:12311 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/9/2020                  Interval Top: 8357 ft.    Interval Bottom: 12311 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/9/2020Treatment End Date:N/A
Treatment Summary:8357-9152, 9196-10252, 10767-12311
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8357 ft.# Of Holes:240
Interval Bottom:12311 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3827
Total Gas Produced (MCF)46385
GOR12120
GOR DeterminationBOE
Average BOE per Day32.364
Average MCFE per Day187.717

 Federal Financial Assurance  i 

 Tribal Well  i No