Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36449
Well Classification: OW Status: PR - 3/1/2020
Well Name/No:BADGER #22N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2020
FacilityID:431166LocationID:431161
County:WELD #123Location:NWNW 15 1N68W 6
Field:WATTENBERG - #90750Elevation:5158 ft.
Planned Location:392FNL  1043 FWLLat/Long: 40.057343 / -104.995490Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.057343 / -104.995490Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/28/2020
End Date: 3/4/2020
Reported: 4/13/2020
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2020             Measured TD: 15261 ft.    Vertical TD: 7739 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/25/2014
Prop Depth/Form:15394 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1239 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 470, Top: 0 ft., Bottom: 1239 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8141 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8141 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7141 ft., Depth: 15394 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/14/2015
Spud Date:10/26/2014Spud Date Is:ACTUAL
Measured TD:15261 ft.Measured PB depth:15162 ft.
True Vertical TD:7739 ft.True Vertical PB depth:7736 ft.
Top PZ Location:Sec:15 Twp: 1N 68WFootage: 449 FNL  1127 FWLDepth
Bottom Hole Location:Sec:3 Twp: 1N 68WFootage: 1408 FSL  1075 FWLDepth
Log Types:CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1312 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 604, Top: 0 ft., Bottom: 1312 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8080 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 8080 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7057 ft., Depth: 15256 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 7058 ft., Bottom: 15256 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4795 ft.
SHARON SPRINGS7578 ft.
NIOBRARA7631 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/23/2020                 Interval Top: 8100 ft.    Interval Bottom: 15123 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/26/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/28/2020Treatment End Date:3/4/2020
Treatment Summary:PERF FROM 8100-15123 482 BBLS 15% HCL ACID, 4,839 BBLS PUMP DOWN, 194,892 BBLS SLICKWATER, 200,213 BBLS TOTAL FLUID. 5,514,070 LBS IN-BASIN 40/140 CAPITAL SANDS, 102,520 LBS WHITE 40/70 OTTAWA/ST. PETERS, 5,616,590 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):200213Max pressure during treatment (psi):7675
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):482Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):450Total flowback volume recovered (bbls):9787
Fresh water used in treatment (bbls):199281Disposition method For flowback:RECYCLE
Total proppant used (lbs):5616590Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7641 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 102
BTU_GAS 1279
CALC_BBLS_OIL 102
CALC_GOR 3176
CALC_MCF_GAS 324
CASING_PRESS 1600
GRAVITY_OIL 47
MCF_GAS 324
TUBING_PRESS 1600
Perforation Data:
Interval Top:8100 ft.# Of Holes:780
Interval Bottom:15123 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)7912
Total Gas Produced (MCF)109873
GOR13886
GOR DeterminationBOE
Average BOE per Day73.362
Average MCFE per Day425.497

 Federal Financial Assurance  i 

 Tribal Well  i No