Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36364
Well Classification: OW Status: PR - 7/1/2021
Well Name/No:POWERS #30N-27HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2021
FacilityID:430975LocationID:430972
County:WELD #123Location:SWSW 27 2N65W 6
Field:WATTENBERG - #90750Elevation:4934 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:510FSL  540 FWLLat/Long: 40.103720 / -104.657345Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103719 / -104.657351Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/16/2013
End Date: 4/18/2013
Reported: 6/12/2013
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2021             Measured TD: 11592 ft.    Vertical TD: 7036 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2014
Proposed Top PZ Location:Sec:27 Twp: 2N 65W Footage: 631 FSL  29 FWL
Bottom Hole Location:Sec:27 Twp: 2N 65W Footage: 460 FNL  20 FWL
Proposed Depth/Form:11631 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1820 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1820 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7463 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 7463 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6463 ft., Depth: 11631 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/22/2013
Spud Date:12/18/2012Spud Date Is:ACTUAL
Measured TD:11592 ft.Measured PB depth:11568 ft.
True Vertical TD:7036 ft.True Vertical PB depth:7037 ft.
Top PZ Location:Sec:27 Twp: 2N 65WFootage: 725 FSL  21 FWL
Bottom Hole Location:Sec:27 Twp: 2N 21Footage: 485 FNL  34 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1842 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1842 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7544 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 965 ft., Bottom: 7544 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6491 ft., Depth: 11577 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7027 ft.
NIOBRARA7100 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2021                  Interval Top: 7584 ft.    Interval Bottom: 11592 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/23/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/16/2013Treatment End Date:4/18/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7584-11592. 9522 BBL CROSSLINK GEL, 853 BBL LINEAR GEL, 66502 BBL SLICKWATER, 76876 BBL TOTAL FLUID. 304400# 30/50 SAND, 1590220# 40/70 SAND, 24660# 20/40 SAND, 1919280# TOTAL SAND.
Total fluid used in treatment (bbls):76876Max pressure during treatment (psi):7719
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6458
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1919280Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7045 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 183
BBLS_OIL 395
BTU_GAS 1298
CALC_BBLS_H2O 183
CALC_BBLS_OIL 395
CALC_GOR 1448
CALC_MCF_GAS 572
CASING_PRESS 1770
GRAVITY_OIL 51
MCF_GAS 572
TUBING_PRESS 1416
Perforation Data:
Interval Top:7584 ft.# Of Holes:0
Interval Bottom:11592 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)121
Total Gas Produced (MCF)1392
GOR11504
GOR DeterminationBOE
Average BOE per Day1.055
Average MCFE per Day6.098

 Federal Financial Assurance  i 

 Tribal Well  i No