Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36359
Well Classification: GW Status: PR - 9/1/2022
Well Name/No:POWERS #29N-27HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2022
FacilityID:430969LocationID:430967
County:WELD #123Location:SESW 27 2N65W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:510FSL  1890 FWLLat/Long: 40.103699 / -104.652518Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103699 / -104.652521Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/13/2013
End Date: 4/14/2013
Reported: 6/10/2013
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2022             Measured TD: 11576 ft.    Vertical TD: 7063 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2014
Proposed Top PZ Location:Sec:27 Twp: 2N 65W Footage: 762 FSL  1475 FWL
Bottom Hole Location:Sec:27 Twp: 2N 65W Footage: 485 FNL  1455 FWL
Proposed Depth/Form:11644 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1820 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1820 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7451 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 7451 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6399 ft., Depth: 11644 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/28/2013
Spud Date:12/31/2012Spud Date Is:ACTUAL
Measured TD:11576 ft.Measured PB depth:11552 ft.
True Vertical TD:7063 ft.True Vertical PB depth:7064 ft.
Top PZ Location:Sec:27 Twp: 2N 65WFootage: 762 FSL  1475 FWL
Bottom Hole Location:Sec:27 Twp: 2N 65WFootage: 485 FNL  1455 FWL
Log Types:PRE FORM 5
Log Types:CBL; GR; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1858 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 1858 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7543 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 736, Top: 280 ft., Bottom: 7543 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 11561 ft., Depth: , Weight: 6509 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7048 ft.
NIOBRARA7130 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 9/1/2022                  Interval Top: 7603 ft.    Interval Bottom: 11576 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/27/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/13/2013Treatment End Date:4/14/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7603-11576. 30099 BBL CROSSLINK GEL, 117 BBL LINEAR GEL, 43125 BBL SLICKWATER, 73342 BBL TOTAL FLUID. 1088128# 40/70 SAND, 2356089# 30/50 SAND, 228430# 20/40 SAND, 2672647# TOTAL SAND.
Total fluid used in treatment (bbls):73342Max pressure during treatment (psi):6862
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):40.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7362
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2672647Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6947 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 322
BBLS_OIL 270
BTU_GAS 1298
CALC_BBLS_H2O 322
CALC_BBLS_OIL 270
CALC_GOR 1589
CALC_MCF_GAS 429
CASING_PRESS 1726
GRAVITY_OIL 51
MCF_GAS 429
TUBING_PRESS 1252
Perforation Data:
Interval Top:7603 ft.# Of Holes:0
Interval Bottom:11576 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1563
Total Gas Produced (MCF)28370
GOR18150
GOR DeterminationMCFE
Average BOE per Day19.290
Average MCFE per Day111.888

 Federal Financial Assurance  i 

 Tribal Well  i No