Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36352
Well Classification: OW Status: PR - 11/1/2017
Well Name/No:DECHANT #35N-E1HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2017
FacilityID:430961LocationID:430960
County:WELD #123Location:SESW 36 3N65W 6
Field:WATTENBERG - #90750Elevation:4829 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FSL  1392 FWLLat/Long: 40.174997 / -104.616800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175001 / -104.616800Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/28/2013
End Date: 4/30/2013
Reported: 6/12/2013
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2017             Measured TD: 11561 ft.    Vertical TD: 6808 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2014
Proposed Top PZ Location:Sec:36 Twp: 3N 65W Footage: 498 FNL  1581 FWL
Bottom Hole Location:Sec:1 Twp: 3N 65W Footage: 543 FSL  1604 FWL
Proposed Depth/Form:11508 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7301 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7301 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6071 ft., Depth: 11508 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/2/2013
Spud Date:1/19/2013Spud Date Is:ACTUAL
Measured TD:11561 ft.Measured PB depth:11600 ft.
True Vertical TD:6808 ft.True Vertical PB depth:6901 ft.
Top PZ Location:Sec:36 Twp: 3N 65WFootage: 498 FNL  1581 FWL
Bottom Hole Location:Sec:1 Twp: 3N 65WFootage: 543 FSL  1604 FWL
Log Types:PRE FORM 5
Log Types:CBL; GR; RES; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 726 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 336, Top: 0 ft., Bottom: 726 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7468 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 640 ft., Bottom: 7468 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5897 ft., Depth: 11609 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6953 ft.
NIOBRARA7125 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2017                 Interval Top: 7519 ft.    Interval Bottom: 11619 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/10/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/28/2013Treatment End Date:4/30/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7519-11619. 9464 BBL CROSSLINK GEL, 863 BBL LINEAR GEL, 94600 BBL SLICKWATER, 104926 BBL TOTAL FLUID. 227464# 40/70 SAND, 281200# 30/50 SAND, 24780# 20/40 SAND, 2580620# TOTAL SAND.
Total fluid used in treatment (bbls):104926Max pressure during treatment (psi):6423
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4743
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2580620Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6891 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 414
BBLS_OIL 251
BTU_GAS 1263
CALC_BBLS_H2O 414
CALC_BBLS_OIL 251
CALC_GOR 1462
CALC_MCF_GAS 367
CASING_PRESS 2174
GRAVITY_OIL 47
MCF_GAS 367
TUBING_PRESS 1522
Perforation Data:
Interval Top:7519 ft.# Of Holes:0
Interval Bottom:11619 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1735
Total Gas Produced (MCF)41993
GOR24203
GOR DeterminationMCFE
Average BOE per Day24.524
Average MCFE per Day142.208

 Federal Financial Assurance  i 

 Tribal Well  i No