Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36350
Well Classification: GW Status: PR - 11/1/2017
Well Name/No:DECHANT #36N-W1HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2017
FacilityID:430958LocationID:430960
County:WELD #123Location:SESW 36 3N65W 6
Field:WATTENBERG - #90750Elevation:4831 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FSL  1452 FWLLat/Long: 40.174997 / -104.616585Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175003 / -104.616582Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/4/2013
End Date: 5/6/2013
Reported: 6/25/2013
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2017             Measured TD: 11580 ft.    Vertical TD: 6954 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2014
Proposed Top PZ Location:Sec:1 Twp: 2N 65W Footage: 584 FNL  2305 FWL
Bottom Hole Location:Sec:1 Twp: 2N 65W Footage: 485 FSL  2284 FWL
Proposed Depth/Form:11651 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7421 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 7421 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6194 ft., Depth: 11651 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/28/2013
Spud Date:1/21/2013Spud Date Is:ACTUAL
Measured TD:11580 ft.Measured PB depth:11556 ft.
True Vertical TD:6954 ft.True Vertical PB depth:6953 ft.
Top PZ Location:Sec:1 Twp: 2N 65WFootage: 584 FNL  2305 FWL
Bottom Hole Location:Sec:1 Twp: 2N 65WFootage: 485 FSL  2284 FWL
Log Types:PRE FORM 5
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 733 ft., Weight: 36.0 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 733 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7499 ft., Weight: 26.0 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 18 ft., Bottom: 7499 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6227 ft., Depth: 11565 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7029 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 11/1/2017                 Interval Top: 7534 ft.    Interval Bottom: 11580 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/15/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/4/2013Treatment End Date:5/6/2013
Treatment Summary:OPEN HOLE COMPLETION FROM 7534-11580. 8455 BBL CROSSLINK GEL, 766 BBL LINEAR GEL, 111781 BBL SLICKWATER, 121002 BBL TOTAL FLUID. 2756260# 40/70 SAND, 252940# 30/50 SAND, 39180# 20/40 SAND, 3048380# TOTAL SAND.
Total fluid used in treatment (bbls):121002Max pressure during treatment (psi):7173
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6356
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3048380Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6888 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 331
BTU_GAS 1263
CALC_BBLS_H2O 24
CALC_BBLS_OIL 331
CALC_GOR 1840
CALC_MCF_GAS 609
CASING_PRESS 2152
GRAVITY_OIL 47
MCF_GAS 609
TUBING_PRESS 1584
Perforation Data:
Interval Top:7534 ft.# Of Holes:0
Interval Bottom:11580 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3256
Total Gas Produced (MCF)50768
GOR15592
GOR DeterminationMCFE
Average BOE per Day32.775
Average MCFE per Day190.114

 Federal Financial Assurance  i 

 Tribal Well  i No