|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/22/2025 Measured TD: 7623 ft. Vertical TD: 7419 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/22/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/28/2014 | | Proposed Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 1320 FNL 0 FEL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 1320 FNL 0 FEL | | Proposed Depth/Form: | 7632 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 419, Top: 0 ft., Bottom: 907 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7632 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 751, Top: 3614 ft., Bottom: 7632 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/2/2013 | | Spud Date: | 1/29/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7623 ft. | Measured PB depth: | 7581 ft. | | True Vertical TD: | 7419 ft. | True Vertical PB depth: | 7377 ft. | | Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 1320 FNL 0 FEL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 1320 FNL 0 FEL | | Log Types: | CBL & Triple Combination | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 953 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 953 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7594 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 2040 ft., Bottom: 7594 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | CODELL | | 7460 ft. | | | | FORT HAYS | | 7439 ft. | | | | GREELEY SAND | | 2914 ft. | | | | NIOBRARA | | 7184 ft. | | | | PARKMAN | | 4160 ft. | | | | SUSSEX | | 4520 ft. | | |
Formation CODL Formation Classification: OW Status: CM - 6/25/2024 Interval Top: 7462 ft. Interval Bottom: 7474 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/23/2013 | Treatment End Date: | 5/23/2013 | | Treatment Summary: | Total 92,080 lbs 20/40 White Sand, & 4,000 lbs 20/40 SLC. Slickwater pumped 2581 bbls. Flowback determined from well test seperator. | | Total fluid used in treatment (bbls): | 2581 | Max pressure during treatment (psi): | 5208 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 763 | | Fresh water used in treatment (bbls): | 2581 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 96080 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7462 ft. | # Of Holes: | 48 | | Interval Bottom: | 7474 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/22/2025 Interval Top: 7238 ft. Interval Bottom: 7474 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 65 | | BTU_GAS | 1263 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 3646 | | CALC_MCF_GAS | 237 | | CASING_PRESS | 990 | | GRAVITY_OIL | 49 | | MCF_GAS | 237 |
| | Perforation Data: | | Interval Top: | 7238 ft. | # Of Holes: | 138 | | Interval Bottom: | 7474 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/25/2024 Interval Top: 7238 ft. Interval Bottom: 7364 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/23/2013 | Treatment End Date: | 5/23/2013 | | Treatment Summary: | Total 200,560 lbs 40/70 White Sand, 4,000 lbs 20/40 SLC. Pumped 24 bbls 15% HCl. Slickwater pumped 5383 bbls. Flowback determined from well test seperator. | | Total fluid used in treatment (bbls): | 5407 | Max pressure during treatment (psi): | 4665 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 763 | | Fresh water used in treatment (bbls): | 5383 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204560 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7238 ft. | # Of Holes: | 90 | | Interval Bottom: | 7364 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/22/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/09/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|