|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2022 Measured TD: 10271 ft. Vertical TD: 5967 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/5/2014 | Prop Depth/Form: | 10237 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: Sect. 18 all | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 395, Top: 0 ft., Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6311 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 442, Top: 0 ft., Bottom: 6311 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6124 ft., Depth: 10237 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: |
| | |
Wellbore Completed | Completion Date: | 2/27/2013 | Spud Date: | 2/19/2013 | Spud Date Is: | ACTUAL | Measured TD: | 10271 ft. | Measured PB depth: | 10260 ft. | True Vertical TD: | 5967 ft. | True Vertical PB depth: | 5956 ft. | Top PZ Location: | Sec:18 Twp: 9N 58W | Footage: 866 FSL 1977 FEL | Depth | Bottom Hole Location: | Sec:18 Twp: 9N 58W | Footage: 669 FNL 2075 FEL | Depth | Log Types: | CBL(logs sent 6/25/13), MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 892 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 892 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6355 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 510 ft., Bottom: 6355 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6258 ft., Depth: 6258 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 10261, Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2538 ft. | | | | PARKMAN | 3421 ft. | | | | SUSSEX | 4197 ft. | | | | SHANNON | 4619 ft. | | | | TEEPEE BUTTES | 5133 ft. | | | | NIOBRARA | 6083 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 8/1/2022 Interval Top: 6493 ft. Interval Bottom: 10153 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/22/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/6/2013 | Treatment End Date: | 4/6/2013 | Treatment Summary: | FRAC'D W/1842998 GAL SILVERSTIM ADN SLICK WATER AND 2409747# OTTAWA SAND | Total fluid used in treatment (bbls): | 43881 | Max pressure during treatment (psi): | 4240 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 20 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | 2616 | Total flowback volume recovered (bbls): | 9265 | Fresh water used in treatment (bbls): | 41265 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2409747 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6253 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/26/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 151 | BBLS_OIL | 139 | BTU_GAS | 1346 | CALC_BBLS_H2O | 151 | CALC_BBLS_OIL | 139 | CALC_GOR | 367 | CALC_MCF_GAS | 51 | CASING_PRESS | 119 | GRAVITY_OIL | 34 | MCF_GAS | 51 | TUBING_PRESS | 363 |
| Perforation Data: | Interval Top: | 6493 ft. | # Of Holes: | 0 | Interval Bottom: | 10153 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 09/16/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 07/31/2022 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|