Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36254
Well Classification: OW Status: PR - 11/1/2021
Well Name/No:MILLENSIFER FED #37N-W30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2021
FacilityID:430679LocationID:330954
County:WELD #123Location:NWNE 30 3N66W 6
Field:WATTENBERG - #90750Elevation:4827 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:472FNL  2039 FELLat/Long: 40.201609 / -104.817930Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.201604 / -104.817949Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/4/2013
End Date: 2/4/2013
Reported: 3/27/2013
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2021             Measured TD: 11628 ft.    Vertical TD: 7121 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2014
Proposed Top PZ Location:Sec:30 Twp: 3N 66W Footage: 617 FNL  1618 FEL
Bottom Hole Location:Sec:30 Twp: 3N 66W Footage: 460 FSL  1620 FEL
Proposed Depth/Form:11674 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7442 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 7442 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6397 ft., Depth: 11674 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/19/2012
Spud Date:11/19/2012Spud Date Is:ACTUAL
Measured TD:11628 ft.Measured PB depth:11599 ft.
True Vertical TD:7121 ft.True Vertical PB depth:7121 ft.
Top PZ Location:Sec:30 Twp: 3N 66WFootage: 718 FNL  1643 FEL
Bottom Hole Location:Sec:30 Twp: 3N 66WFootage: 485 FSL  1631 FEL
Log Types:PRE FORM 5
Log Types:CBL; (2) NFE-GR; (2) MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 728 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 728 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7522 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 240 ft., Bottom: 7522 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6456 ft., Depth: 11608 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7128 ft.
NIOBRARA7253 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2021                 Interval Top: 7573 ft.    Interval Bottom: 11618 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/3/2013Treatment End Date:2/4/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7573-11618. 9764 BBL CROSSLINK GEL, 1056 BBL LINEAR GEL, 65073 BBL SLICKWATER, 75893 BBL TOTAL FLUID. 1625346# OTTAWA 40/70 SAND, 309632# OTTAWA 30/50 SAND, 28738# CRC 20/40 SAND, 1963716# TOTAL SAND.
Total fluid used in treatment (bbls):75893Max pressure during treatment (psi):7543
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):11216
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1963716Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7069 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 357
BTU_GAS 1196
CALC_BBLS_OIL 357
CALC_GOR 2042
CALC_MCF_GAS 729
CASING_PRESS 1700
GRAVITY_OIL 48
MCF_GAS 729
TUBING_PRESS 1440
Perforation Data:
Interval Top:7573 ft.# Of Holes:0
Interval Bottom:11618 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1505
Total Gas Produced (MCF)16944
GOR11258
GOR DeterminationBOE
Average BOE per Day12.144
Average MCFE per Day70.424

 Federal Financial Assurance  i 

 Tribal Well  i No