Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36246
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:SPARBOE #2N-26HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:430667LocationID:430664
County:WELD #123Location:SWSE 35 2N65W 6
Field:WATTENBERG - #90750Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:342FSL  1909 FELLat/Long: 40.088447 / -104.628297Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.088445 / -104.628298Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/28/2013
End Date: 6/18/2013
Reported: 8/13/2013
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 16917 ft.    Vertical TD: 7057 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/29/2014
Proposed Top PZ Location:Sec:35 Twp: 2N 65W Footage: 619 FSL  2001 FEL
Bottom Hole Location:Sec:26 Twp: 2N 65W Footage: 496 FNL  2001 FEL
Proposed Depth/Form:16932 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1810 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 620, Top: 0 ft., Bottom: 1810 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7346 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 7346 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6313 ft., Depth: 16932 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/17/2013
Spud Date:2/15/2013Spud Date Is:ACTUAL
Measured TD:16917 ft.Measured PB depth:16893 ft.
True Vertical TD:7057 ft.True Vertical PB depth:7055 ft.
Top PZ Location:Sec:35 Twp: 2N 65WFootage: 619 FSL  2001 FEL
Bottom Hole Location:Sec:26 Twp: 2N 65WFootage: 496 FNL  2001 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1833 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 618, Top: 0 ft., Bottom: 1833 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7344 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 180 ft., Bottom: 7344 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6379 ft., Depth: 16902 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6910 ft.
NIOBRARA6949 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7494 ft.    Interval Bottom: 16788 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/15/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/28/2013Treatment End Date:6/18/2013
Treatment Summary:OPEN HOLE COMPLETION FROM 7494-16788. 44365 BBL CROSSLINK GEL, 2602 BBL LINEAR GEL, 105831 BBL SLICKWATER, 152797 BBL TOTAL FLUID. 2835380# 40/70 SAND, 2293121# 30/50 SAND, 190881# 20/40 SAND, 5319383# TOTAL SAND.
Total fluid used in treatment (bbls):152797Max pressure during treatment (psi):7665
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):22063
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5319383Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6938 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 364
BBLS_OIL 136
BTU_GAS 1305
CALC_BBLS_H2O 364
CALC_BBLS_OIL 136
CALC_GOR 1493
CALC_MCF_GAS 203
CASING_PRESS 2231
GRAVITY_OIL 45
MCF_GAS 203
TUBING_PRESS 1517
Perforation Data:
Interval Top:7494 ft.# Of Holes:0
Interval Bottom:16788 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4802
Total Gas Produced (MCF)31361
GOR6530
GOR DeterminationBOE
Average BOE per Day27.799
Average MCFE per Day161.220

 Federal Financial Assurance  i 

 Tribal Well  i No