Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36238
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:SPARBOE #8N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:430657LocationID:318208
County:WELD #123Location:NENE 34 2N65W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:228FNL  739 FELLat/Long: 40.101630 / -104.643135Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101629 / -104.643141Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2013
End Date: 5/22/2013
Reported: 7/1/2013
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2025             Measured TD: 14214 ft.    Vertical TD: 7063 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/29/2014
Proposed Top PZ Location:Sec:34 Twp: 2N 65W Footage: 718 FNL  763 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65W Footage: 2107 FNL  751 FEL
Proposed Depth/Form:14179 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1830 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7359 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 7359 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6342 ft., Depth: 14179 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/15/2013
Spud Date:11/28/2012Spud Date Is:ACTUAL
Measured TD:14214 ft.Measured PB depth:1490 ft.
True Vertical TD:7063 ft.True Vertical PB depth:7063 ft.
Top PZ Location:Sec:34 Twp: 2N 65WFootage: 718 FNL  763 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65WFootage: 2107 FNL  751 FEL
Log Types:PRE FORM 5
Log Types:GR/GR-RES/MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1856 ft., Weight: 36.0 , Citings Type: ACTUAL
Cement:Sacks: 805, Top: 0 ft., Bottom: 1856 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7466 ft., Weight: 26.0 , Citings Type: ACTUAL
Cement:Sacks: 639, Top: 1060 ft., Bottom: 7466 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6379 ft., Depth: 14199 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7027 ft.
NIOBRARA7255 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2024                 Interval Top: 7497 ft.    Interval Bottom: 14214 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/30/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/19/2013Treatment End Date:5/22/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7497-14214. 28100 BBL CROSSLINK GEL,954 BBL LINEAR GEL,140417 BBL SLICKWATER,169471 BBL TOTAL FLUID. 1027157# 30/50 SAND,3359972# 40/70 SAND,4387129# TOTAL SAND.
Total fluid used in treatment (bbls):169471Max pressure during treatment (psi):7524
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):14516
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4387129Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6927 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 462
BBLS_OIL 29
BTU_GAS 1256
CALC_BBLS_H2O 462
CALC_BBLS_OIL 29
CALC_GOR 931
CALC_MCF_GAS 27
CASING_PRESS 1880
GRAVITY_OIL 44
MCF_GAS 27
TUBING_PRESS 1369
Perforation Data:
Interval Top:7497 ft.# Of Holes:0
Interval Bottom:14214 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.022

 Federal Financial Assurance  i 

 Tribal Well  i No