Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36238
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:SPARBOE #8N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:430657LocationID:318208
County:WELD #123Location:NENE 34 2N65W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:228FNL  739 FELLat/Long: 40.101630 / -104.643135Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101629 / -104.643141Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2013
End Date: 5/22/2013
Reported: 7/1/2013
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2025             Measured TD: 14214 ft.    Vertical TD: 7063 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/29/2014
Proposed Top PZ Location:Sec:34 Twp: 2N 65W Footage: 718 FNL  763 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65W Footage: 2107 FNL  751 FEL
Proposed Depth/Form:14179 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1830 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7359 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 7359 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6342 ft., Depth: 14179 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/15/2013
Spud Date:11/28/2012Spud Date Is:ACTUAL
Measured TD:14214 ft.Measured PB depth:1490 ft.
True Vertical TD:7063 ft.True Vertical PB depth:7063 ft.
Top PZ Location:Sec:34 Twp: 2N 65WFootage: 718 FNL  763 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65WFootage: 2107 FNL  751 FEL
Log Types:PRE FORM 5
Log Types:GR/GR-RES/MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1856 ft., Weight: 36.0 , Citings Type: ACTUAL
Cement:Sacks: 805, Top: 0 ft., Bottom: 1856 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7466 ft., Weight: 26.0 , Citings Type: ACTUAL
Cement:Sacks: 639, Top: 1060 ft., Bottom: 7466 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6379 ft., Depth: 14199 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7027 ft.
NIOBRARA7255 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2024                 Interval Top: 7497 ft.    Interval Bottom: 14214 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/30/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/19/2013Treatment End Date:5/22/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7497-14214. 28100 BBL CROSSLINK GEL,954 BBL LINEAR GEL,140417 BBL SLICKWATER,169471 BBL TOTAL FLUID. 1027157# 30/50 SAND,3359972# 40/70 SAND,4387129# TOTAL SAND.
Total fluid used in treatment (bbls):169471Max pressure during treatment (psi):7524
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):14516
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4387129Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6927 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 462
BBLS_OIL 29
BTU_GAS 1256
CALC_BBLS_H2O 462
CALC_BBLS_OIL 29
CALC_GOR 931
CALC_MCF_GAS 27
CASING_PRESS 1880
GRAVITY_OIL 44
MCF_GAS 27
TUBING_PRESS 1369
Perforation Data:
Interval Top:7497 ft.# Of Holes:0
Interval Bottom:14214 ft.Hole Size:0 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/11/2024
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No