Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36237
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:SPARBOE #40N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:430656LocationID:318208
County:WELD #123Location:NENE 34 2N65W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:229FNL  709 FELLat/Long: 40.101628 / -104.643027Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101628 / -104.642917Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/26/2013
End Date: 5/28/2013
Reported: 7/1/2013
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 14032 ft.    Vertical TD: 7038 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/29/2014
Proposed Top PZ Location:Sec:34 Twp: 2N 65W Footage: 929 FNL  52 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65W Footage: 2075 FNL  29 FEL
Proposed Depth/Form:14204 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1830 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7402 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 7402 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6387 ft., Depth: 14204 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/5/2013
Spud Date:12/3/2012Spud Date Is:ACTUAL
Measured TD:14032 ft.Measured PB depth:14008 ft.
True Vertical TD:7038 ft.True Vertical PB depth:7039 ft.
Top PZ Location:Sec:34 Twp: 2N 65WFootage: 929 FNL  52 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65WFootage: 2075 FNL  29 FEL
Log Types:PRE FORM 5
Log Types:CBL; GR; RES; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1857 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1857 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7507 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 1345 ft., Bottom: 7507 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6480 ft., Depth: 14017 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7165 ft.
NIOBRARA7226 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2024                  Interval Top: 7569 ft.    Interval Bottom: 14032 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/30/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/26/2013Treatment End Date:5/28/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7569-14032. 18766 BBL CROSSLINK GEL,658 BBL LINEAR GEL,104426 BBL SLICKWATER,123850 BBL TOTAL FLUID. 627481# 30/50 SAND,2461978# 40/70 SAND,3089459# TOTAL SAND.
Total fluid used in treatment (bbls):123850Max pressure during treatment (psi):7621
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):14476
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3089459Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7020 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/13/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 636
BBLS_OIL 39
BTU_GAS 1256
CALC_BBLS_H2O 636
CALC_BBLS_OIL 39
CALC_GOR 2744
CALC_MCF_GAS 107
CASING_PRESS 2326
GRAVITY_OIL 44
MCF_GAS 107
TUBING_PRESS 1459
Perforation Data:
Interval Top:7569 ft.# Of Holes:0
Interval Bottom:14032 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)986
Total Gas Produced (MCF)3457
GOR3506
GOR DeterminationBOE
Average BOE per Day4.343
Average MCFE per Day25.173

 Federal Financial Assurance  i 

 Tribal Well  i No