Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36235
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:SPARBOE #7N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:430653LocationID:430655
County:WELD #123Location:NWNE 34 2N65W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:280FNL  1519 FELLat/Long: 40.101501 / -104.645921Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101501 / -104.645923Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/1/2013
End Date: 5/16/2013
Reported: 6/26/2013
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 13900 ft.    Vertical TD: 7123 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/29/2014
Proposed Top PZ Location:Sec:34 Twp: 2N 65W Footage: 630 FNL  1980 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65W Footage: 2151 FNL  1980 FEL
Proposed Depth/Form:14252 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 1830 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7405 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 7405 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6378 ft., Depth: 14252 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/10/2013
Spud Date:12/11/2012Spud Date Is:ACTUAL
Measured TD:13900 ft.Measured PB depth:13801 ft.
True Vertical TD:7123 ft.True Vertical PB depth:7113 ft.
Top PZ Location:Sec:34 Twp: 2N 65WFootage: 1073 FNL  2036 FEL
Bottom Hole Location:Sec:3 Twp: 1N 65WFootage: 2125 FNL  1987 FEL
Log Types:PRE FORM 5
Log Types:GR/RES/MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1883 ft., Weight: 36.0 , Citings Type: ACTUAL
Cement:Sacks: 654, Top: 16 ft., Bottom: 1883 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7514 ft., Weight: 26.0 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 355 ft., Bottom: 7514 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6448 ft., Depth: 13895 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7110 ft.
NIOBRARA7338 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 7553 ft.    Interval Bottom: 13769 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/27/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/1/2013Treatment End Date:5/16/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7553-13769. 540 BBL CROSSLINK GEL, 245 BBL LINEAR GEL, 138293 BBL SLICKWATER, 131 BBL ACID, 139210 BBL TOTAL FLUID. 2516286# 40/70 SAND, 263437# 30/50 SAND, 2779723# TOTAL SAND.
Total fluid used in treatment (bbls):139210Max pressure during treatment (psi):7543
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):131Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17288
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2779723Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7094 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 306
BBLS_OIL 260
BTU_GAS 1314
CALC_BBLS_H2O 306
CALC_BBLS_OIL 260
CASING_PRESS 2170
GRAVITY_OIL 45
TUBING_PRESS 1686
Perforation Data:
Interval Top:7553 ft.# Of Holes:0
Interval Bottom:13769 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)2024
Total Gas Produced (MCF)25091
GOR12396
GOR DeterminationBOE
Average BOE per Day17.345
Average MCFE per Day100.586

 Federal Financial Assurance  i 

 Tribal Well  i No