Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36226
Well Classification: OW Status: SI - 5/1/2025
Well Name/No:RUSSIAN FIDDLER #13N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:430633LocationID:430621
County:WELD #123Location:SWSW 19 2N65W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:318FSL  1213 FWLLat/Long: 40.117495 / -104.711511Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117501 / -104.711518Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2013
End Date: 8/14/2013
Reported: 10/2/2013
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 5/1/2025             Measured TD: 12441 ft.    Vertical TD: 7265 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2014
Proposed Top PZ Location:Sec:19 Twp: 2N 65W Footage: 626 FSL  516 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65W Footage: 460 FSL  535 FWL
Proposed Depth/Form:12762 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7630 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 7630 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6601 ft., Depth: 12762 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/2/2013
Spud Date:2/15/2013Spud Date Is:ACTUAL
Measured TD:12441 ft.Measured PB depth:12423 ft.
True Vertical TD:7265 ft.True Vertical PB depth:7264 ft.
Top PZ Location:Sec:19 Twp: 2N 65WFootage: 670 FSL  510 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65WFootage: 94 FSL  517 FWL
Log Types:CBL; GR; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 471, Top: 0 ft., Bottom: 1023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7711 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 60 ft., Bottom: 7711 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6725 ft., Depth: 12432 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7161 ft.
NIOBRARA7242 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 5/1/2025                  Interval Top: 7741 ft.    Interval Bottom: 12441 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/25/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2013Treatment End Date:8/14/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7741-12441. 71 BBL ACID,3691 BBL CROSSLINK GEL,488 BBL LINEAR GEL,88943 BBL SLICKWATER,93194 BBL TOTAL FLUID. 218971# 30/50 OTTAWA/ST. PETERS SAND,2336151# 40/70 OTTAWA/ST. PETERS SAND,2555122# TOTAL SAND.
Total fluid used in treatment (bbls):93194Max pressure during treatment (psi):7667
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4827
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2555122Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7265 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 149
BTU_GAS 1295
CALC_BBLS_OIL 149
CALC_GOR 1644
CALC_MCF_GAS 245
CASING_PRESS 2668
GRAVITY_OIL 47
MCF_GAS 245
TUBING_PRESS 1968
Perforation Data:
Interval Top:7741 ft.# Of Holes:0
Interval Bottom:12441 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)455
Total Gas Produced (MCF)5113
GOR11237
GOR DeterminationBOE
Average BOE per Day3.600
Average MCFE per Day20.886

 Federal Financial Assurance  i 

 Tribal Well  i No