Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36226
Well Classification: OW Status: SI - 5/1/2025
Well Name/No:RUSSIAN FIDDLER #13N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:430633LocationID:430621
County:WELD #123Location:SWSW 19 2N65W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Planned Location:318FSL  1213 FWLLat/Long: 40.117495 / -104.711511Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117501 / -104.711518Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2013
End Date: 8/14/2013
Reported: 10/2/2013
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 5/1/2025             Measured TD: 12441 ft.    Vertical TD: 7265 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2014
Proposed Top PZ Location:Sec:19 Twp: 2N 65W Footage: 626 FSL  516 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65W Footage: 460 FSL  535 FWL
Proposed Depth/Form:12762 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7630 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 7630 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6601 ft., Depth: 12762 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/2/2013
Spud Date:2/15/2013Spud Date Is:ACTUAL
Measured TD:12441 ft.Measured PB depth:12423 ft.
True Vertical TD:7265 ft.True Vertical PB depth:7264 ft.
Top PZ Location:Sec:19 Twp: 2N 65WFootage: 670 FSL  510 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65WFootage: 94 FSL  517 FWL
Log Types:CBL; GR; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 471, Top: 0 ft., Bottom: 1023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7711 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 60 ft., Bottom: 7711 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6725 ft., Depth: 12432 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7161 ft.
NIOBRARA7242 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 5/1/2025                  Interval Top: 7741 ft.    Interval Bottom: 12441 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/25/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2013Treatment End Date:8/14/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7741-12441. 71 BBL ACID,3691 BBL CROSSLINK GEL,488 BBL LINEAR GEL,88943 BBL SLICKWATER,93194 BBL TOTAL FLUID. 218971# 30/50 OTTAWA/ST. PETERS SAND,2336151# 40/70 OTTAWA/ST. PETERS SAND,2555122# TOTAL SAND.
Total fluid used in treatment (bbls):93194Max pressure during treatment (psi):7667
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4827
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2555122Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7265 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 149
BTU_GAS 1295
CALC_BBLS_OIL 149
CALC_GOR 1644
CALC_MCF_GAS 245
CASING_PRESS 2668
GRAVITY_OIL 47
MCF_GAS 245
TUBING_PRESS 1968
Perforation Data:
Interval Top:7741 ft.# Of Holes:0
Interval Bottom:12441 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)1831
Total Gas Produced (MCF)24211
GOR13222
GOR DeterminationBOE
Average BOE per Day16.316
Average MCFE per Day94.654

 Federal Financial Assurance  i 

 Tribal Well  i No