Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36222
Well Classification: OW Status: PR - 11/1/2020
Well Name/No:RUSSIAN FIDDLER #14N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2020
FacilityID:430628LocationID:430621
County:WELD #123Location:SESW 19 2N65W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:318FSL  1303 FWLLat/Long: 40.117498 / -104.711189Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117501 / -104.711191Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2013
End Date: 8/12/2013
Reported: 9/30/2013
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2020             Measured TD: 12394 ft.    Vertical TD: 7262 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2014
Proposed Top PZ Location:Sec:19 Twp: 2N 65W Footage: 725 FSL  1767 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65W Footage: 100 FSL  1781 FWL
Proposed Depth/Form:12741 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7590 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 7590 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6561 ft., Depth: 12741 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/15/2013
Spud Date:2/20/2013Spud Date Is:ACTUAL
Measured TD:12394 ft.Measured PB depth:12370 ft.
True Vertical TD:7262 ft.True Vertical PB depth:7261 ft.
Top PZ Location:Sec:19 Twp: 2N 65WFootage: 725 FSL  1767 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65WFootage: 100 FSL  1781 FWL
Log Types:CBL,GR,MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1008 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 444, Top: 0 ft., Bottom: 1008 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7705 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 880 ft., Bottom: 7705 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6709 ft., Depth: 12379 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7135 ft.
NIOBRARA7216 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2020                 Interval Top: 7763 ft.    Interval Bottom: 12394 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/24/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/3/2013Treatment End Date:8/12/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7763-12394. 262 BBL ACID,21433 BBL CROSSLINK GEL,5968 BBL LINEAR GEL,68517 BBL SLICKWATER,96179 BBL TOTAL FLUID. 649593# 30/50 OTTAWA/ST. PETERS SAND,1808065# 40/70 OTTAWA/ST. PETERS SAND,2457658# TOTAL SAND.
Total fluid used in treatment (bbls):96179Max pressure during treatment (psi):7567
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):262Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8743
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2457658Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7234 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 318
BTU_GAS 1295
CALC_BBLS_OIL 318
CALC_GOR 1745
CALC_MCF_GAS 555
CASING_PRESS 2524
GRAVITY_OIL 47
MCF_GAS 555
TUBING_PRESS 2026
Perforation Data:
Interval Top:7763 ft.# Of Holes:0
Interval Bottom:12394 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1288
Total Gas Produced (MCF)44045
GOR34196
GOR DeterminationMCFE
Average BOE per Day24.249
Average MCFE per Day140.644

 Federal Financial Assurance  i 

 Tribal Well  i No