|
|
|
|
Wellbore #00 Wellbore Classification: Status: PR - 7/1/2024 Measured TD: 12128 ft. Vertical TD: 7180 ft. Wellbore Data for Original Wellbore | Wellbore Classification: PR - 7/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/25/2014 | Proposed Top PZ Location: | Sec:19 Twp: 2N 65W | Footage: 671 FSL 2392 FWL | Bottom Hole Location: | Sec:19 Twp: 2N 65W | Footage: 163 FNL 2365 FWL | Proposed Depth/Form: | 12785 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36.0 , Citings Type: PLANNED | Cement: | Sacks: 730, Top: 0 ft., Bottom: 980 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7628 ft., Weight: 26.0 , Citings Type: PLANNED | Cement: | Sacks: 730, Top: 0 ft., Bottom: 7628 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6596 ft., Depth: 12785 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 2/21/2013 | Spud Date Is: | ACTUAL | Measured TD: | 12128 ft. | Measured PB depth: | 12128 ft. | True Vertical TD: | 7180 ft. | True Vertical PB depth: | 7180 ft. | Bottom Hole Location: | Sec:19 Twp: 2N 65W | Footage: 163 FNL 2365 FWL | Log Types: | LOGS WILL BE SUBMITTED WITH THE 01 WELLBORE | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1003 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1003 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7668 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 767, Top: 620 ft., Bottom: 7668 ft., Determination Method: CBL | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 11/1/2020 Measured TD: 12416 ft. Vertical TD: 7294 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 11/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/6/2015 | Proposed Top PZ Location: | Sec:19 Twp: 2N 65W | Footage: 671 FSL 2394 FWL | Bottom Hole Location: | Sec:18 Twp: 2N 65W | Footage: 101 FSL 2365 FWL | Proposed Depth/Form: | 12771 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1003 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 730, Top: 0 ft., Bottom: 1003 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7668 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 730, Top: 0 ft., Bottom: 7668 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6596 ft., Depth: 12411 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 6/3/2013 | Spud Date: | 2/21/2013 | Spud Date Is: | ACTUAL | Measured TD: | 12416 ft. | Measured PB depth: | 12357 ft. | True Vertical TD: | 7294 ft. | True Vertical PB depth: | 7293 ft. | Top PZ Location: | Sec:19 Twp: 2N 65W | Footage: 671 FSL 2394 FWL | Bottom Hole Location: | Sec:18 Twp: 2N 65W | Footage: 101 FSL 2365 FWL | Log Types: | CBL; GR; MUD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1003 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1003 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7668 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 767, Top: 620 ft., Bottom: 7668 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6648 ft., Depth: 12406 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 316, Top: 6648 ft., Bottom: 12406 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 7231 ft. | | | | NIOBRARA | 7320 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2020 Interval Top: 7707 ft. Interval Bottom: 12337 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/25/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/3/2013 | Treatment End Date: | 8/10/2013 | Treatment Summary: | PERF AND FRAC FROM 7707-12337.
571 BBL ACID,173765 BBL SLICKWATER,174336 BBL TOTAL FLUID.
5194156# 40/70 OTTAWA/ST. PETERS SAND,5194156# TOTAL SAND. | Total fluid used in treatment (bbls): | 174336 | Max pressure during treatment (psi): | 7493 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 24 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.98 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 8257 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 5194156 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7262 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/7/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 472 | BTU_GAS | 1295 | CALC_BBLS_OIL | 472 | CALC_GOR | 1773 | CALC_MCF_GAS | 837 | CASING_PRESS | 2309 | GRAVITY_OIL | 47 | MCF_GAS | 837 | TUBING_PRESS | 1856 |
| Perforation Data: | Interval Top: | 7707 ft. | # Of Holes: | 868 | Interval Bottom: | 12337 ft. | Hole Size: | 0.43 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1673 |
Total Gas Produced (MCF) | 56446 |
GOR | 33739 |
GOR Determination | MCFE |
Average BOE per Day | 31.313 |
Average MCFE per Day | 181.620 |
Federal Financial Assurance | i | |
|
|