|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2025 Measured TD: 11941 ft. Vertical TD: 7035 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/17/2014 | | Proposed Top PZ Location: | Sec:4 Twp: 2N 65W | Footage: 671 FNL 1100 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 50 FNL 1104 FWL | | Proposed Depth/Form: | 11948 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 856 ft., Weight: 36.0 , Citings Type: PLANNED | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 856 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7369 ft., Weight: 26.0 , Citings Type: PLANNED | | Cement: | Sacks: 720, Top: 0 ft., Bottom: 7369 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6329 ft., Depth: 11948 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 12/13/2012 | | Spud Date: | 11/22/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 11941 ft. | Measured PB depth: | 11922 ft. | | True Vertical TD: | 7035 ft. | True Vertical PB depth: | 7035 ft. | | Top PZ Location: | Sec:4 Twp: 2N 65W | Footage: 671 FNL 1100 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 50 FNL 1104 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; MWD: NFE-GR, MPR-GR; (2) MUD LOG | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 906 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7413 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 170 ft., Bottom: 7413 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6442 ft., Depth: 11931 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7014 ft. | | | | | NIOBRARA | 7175 ft. | | | |
Formation NBRR Formation Classification: GW Status: PR - 8/1/2025 Interval Top: 7446 ft. Interval Bottom: 11941 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/13/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/28/2013 | Treatment End Date: | 3/2/2013 | | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7446-11941.
83212 BBL SLICKWATER, 83212 BBL TOTAL FLUID.
1846600# 40/70 SAND, 1846600# TOTAL SAND. | | Total fluid used in treatment (bbls): | 83212 | Max pressure during treatment (psi): | 7767 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 22 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 6067 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1846600 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6952 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/7/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 182 | | BBLS_OIL | 320 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 182 | | CALC_BBLS_OIL | 320 | | CALC_GOR | 1734 | | CALC_MCF_GAS | 555 | | CASING_PRESS | 2463 | | GRAVITY_OIL | 50 | | MCF_GAS | 555 | | TUBING_PRESS | 1655 |
| | Perforation Data: | | Interval Top: | 7446 ft. | # Of Holes: | 0 | | Interval Bottom: | 11941 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1141 |
| Total Gas Produced (MCF) | 20194 |
| GOR | 17698 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.498 |
| Average MCFE per Day | 78.280 |
| Federal Financial Assurance | i | |
|
|