Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36169
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:RAYMOND #16N-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:430493LocationID:329107
County:WELD #123Location:NENE 30 3N66W 6
Field:WATTENBERG - #90750Elevation:4858 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:649FNL  429 FELLat/Long: 40.201187 / -104.812158Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.201185 / -104.812160Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/9/2013
End Date: 2/9/2013
Reported: 4/10/2013
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 11693 ft.    Vertical TD: 7184 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2014
Proposed Top PZ Location:Sec:30 Twp: 3N 66W Footage: 624 FNL  444 FEL
Bottom Hole Location:Sec:30 Twp: 3N 66W Footage: 460 FSL  410 FEL
Proposed Depth/Form:11738 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7508 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 760, Top: 0 ft., Bottom: 7508 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6508 ft., Depth: 11738 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/7/2013
Spud Date:11/24/2012Spud Date Is:ACTUAL
Measured TD:11693 ft.Measured PB depth:11663 ft.
True Vertical TD:7184 ft.True Vertical PB depth:7183 ft.
Top PZ Location:Sec:30 Twp: 3N 66WFootage: 690 FNL  410 FEL
Bottom Hole Location:Sec:30 Twp: 3N 66WFootage: 486 FSL  404 FEL
Log Types:PRE FORM 5
Log Types:CBL; MWD: GR-MPR; (2) MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 718 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 718 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7569 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 743, Top: 50 ft., Bottom: 7569 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6567 ft., Depth: 11672 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7120 ft.
NIOBRARA7266 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7607 ft.    Interval Bottom: 11693 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/19/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2013Treatment End Date:2/9/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7607-11693. 30688 BBL CROSSLINK GEL, 42793 BBL SLICKWATER, 73481 BBL TOTAL FLUID. 1083161# 40/70 SAND, 2410747# 30/50 SAND, 138431# CRC 20/40 SAND, 3632339# TOTAL SAND.
Total fluid used in treatment (bbls):73481Max pressure during treatment (psi):6602
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10886
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3632339Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7089 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 261
BTU_GAS 1232
CALC_BBLS_OIL 261
CALC_GOR 3605
CALC_MCF_GAS 941
CASING_PRESS 1965
GRAVITY_OIL 50
MCF_GAS 941
TUBING_PRESS 1752
Perforation Data:
Interval Top:7607 ft.# Of Holes:0
Interval Bottom:11693 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1269
Total Gas Produced (MCF)11173
GOR8804
GOR DeterminationBOE
Average BOE per Day8.825
Average MCFE per Day51.178

 Federal Financial Assurance  i 

 Tribal Well  i No