Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36168
Well Classification: OW Status: SI - 7/1/2024
Well Name/No:Wildhorse #16-1613BH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:8435.5
Facility Status:SIStatus Date7/1/2024
FacilityID:430492LocationID:426631
County:WELD #123Location:SWSW 16 9N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5068 ft.
Planned Location:340FSL  607 FWLLat/Long: 40.744128 / -103.990400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.744128 / -103.990400Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/16/2012
End Date: 12/16/2012
Reported: 2/5/2013
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2024             Measured TD: 11352 ft.    Vertical TD: 6268 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2014
Prop Depth/Form:11424 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2020 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 746, Top: 0 ft., Bottom: 2020 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6561 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 461, Top: 0 ft., Bottom: 6561 ft.
Casing:String Type: 2ND, Hole Size: 6 in., Size: 4.5 in., Top: 5743 ft., Depth: 11424 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/24/2012
Spud Date:11/13/2012Spud Date Is:ACTUAL
Measured TD:11352 ft.Measured PB depth:11352 ft.
True Vertical TD:6268 ft.True Vertical PB depth:6268 ft.
Top PZ Location:Sec:16 Twp: 9N 59WFootage: 1228 FSL  726 FWLDepth
Bottom Hole Location:Sec:16 Twp: 9N 59WFootage: 1400 FNL  681 FELDepth
Log Types:AI, CPD/CND, HVC, GR-CCL/SB-VDL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2065 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 989, Top: 0 ft., Bottom: 2065 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6640 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 454, Top: 120 ft., Bottom: 6640 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5535 ft., Depth: 11342 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE1803 ft.NN
HYGIENE3529 ft.NN
SHARON SPRINGS6133 ft.NN
NIOBRARA6146 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 7/1/2024                  Interval Top: 6640 ft.    Interval Bottom: 11352 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/24/2012Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/17/2012Treatment End Date:12/19/2012
Treatment Summary:24 stage pHaserFrac using 403,366# 40/70 Ottawa sand, 1,847,900# 20/40 Ottawa sand, 489,232# CRC 20/40, 68,824 bbls slickwater
Total fluid used in treatment (bbls):68824Max pressure during treatment (psi):6055
Total gas used in treatment (mcf):0Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):18832
Fresh water used in treatment (bbls):68824Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2740498Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/25/2012Test Method:separator
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 462
BBLS_OIL 447
BTU_GAS 1236
CALC_BBLS_H2O 462
CALC_BBLS_OIL 447
CALC_GOR 830
CALC_MCF_GAS 371
CASING_PRESS 150
GRAVITY_OIL 32
MCF_GAS 371
Perforation Data:
Interval Top:6640 ft.# Of Holes:
Interval Bottom:11352 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)1474
Total Gas Produced (MCF)4842
GOR3284
GOR DeterminationBOE
Average BOE per Day6.330
Average MCFE per Day36.709

 Federal Financial Assurance  i 

 Tribal Well  i No