Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36141
Well Classification: GW Status: PR - 2/1/2023
Well Name/No:REIGLE #2N-4HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:430358LocationID:332111
County:WELD #123Location:SWSE 4 2N65W 6
Field:WATTENBERG - #90750Elevation:4858 ft.
Planned Location:583FSL  2406 FELLat/Long: 40.162110 / -104.667908Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.162112 / -104.667911Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/17/2013
End Date: 2/17/2013
Reported: 4/11/2013
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2023             Measured TD: 11425 ft.    Vertical TD: 7012 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/3/2014
Prop Depth/Form:11453 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 856 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 604, Top: 0 ft., Bottom: 856 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7386 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7386 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6307 ft., Depth: 11453 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/25/2012
Spud Date:10/22/2012Spud Date Is:ACTUAL
Measured TD:11425 ft.Measured PB depth:11401 ft.
True Vertical TD:7012 ft.True Vertical PB depth:7012 ft.
Top PZ Location:Sec:4 Twp: 2N 65WFootage: 509 FSL  2009 FELDepth
Bottom Hole Location:Sec:4 Twp: 2N 65WFootage: 486 FNL  2020 FELDepth
Log Types:PRE FORM 5
Log Types:CBL; MWD: SGRR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 900 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7263 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 703, Top: 890 ft., Bottom: 7263 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6427 ft., Depth: 11410 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6915 ft.
NIOBRARA7005 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 2/1/2023                  Interval Top: 7344 ft.    Interval Bottom: 11410 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/3/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/16/2013Treatment End Date:2/17/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7344-11410. 12544 BBL CROSSLINK GEL, 860 BBL LINEAR GEL, 58632 BBL SLICKWATER, 72036 BBL TOTAL FLUID. 1512640# 40/70 SAND, 301700# 30/50 SAND, 25540# 20/40 SAND, 1839880# TOTAL SAND.
Total fluid used in treatment (bbls):72036Max pressure during treatment (psi):7708
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):1.20
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7522
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1839880Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6964 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 162
BBLS_OIL 341
BTU_GAS 1242
CALC_BBLS_H2O 162
CALC_BBLS_OIL 341
CALC_GOR 1463
CALC_MCF_GAS 499
CASING_PRESS 2225
GRAVITY_OIL 48
MCF_GAS 499
TUBING_PRESS 1535
Perforation Data:
Interval Top:7344 ft.# Of Holes:0
Interval Bottom:11410 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)644
Total Gas Produced (MCF)3417
GOR5305
GOR DeterminationBOE
Average BOE per Day3.371
Average MCFE per Day19.555

 Federal Financial Assurance  i 

 Tribal Well  i No