Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36135
Well Classification: OW Status: PR - 9/1/2017
Well Name/No:IONE #1F-2H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2017
FacilityID:430348LocationID:430283
County:WELD #123Location:NWNE 2 2N66W 6
Field:WATTENBERG - #90750Elevation:5078 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:419FNL  1317 FELLat/Long: 40.173440 / -104.739710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.173442 / -104.739721Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/30/2013
End Date: 4/2/2013
Reported: 6/26/2013
Days to report: 85
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2017             Measured TD: 12060 ft.    Vertical TD: 7365 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/30/2014
Proposed Top PZ Location:Sec:2 Twp: 2N 66W Footage: 583 FNL  165 FEL
Bottom Hole Location:Sec:2 Twp: 2N 66W Footage: 460 FSL  200 FEL
Proposed Depth/Form:11978 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 916 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 249, Top: 0 ft., Bottom: 916 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7752 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 950, Top: 616 ft., Bottom: 7752 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11978 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 373, Top: 7452 ft., Bottom: 11978 ft.

Wellbore Completed
Completion Date:2/24/2013
Spud Date:12/3/2012Spud Date Is:ACTUAL
Measured TD:12060 ft.Measured PB depth:12041 ft.
True Vertical TD:7365 ft.True Vertical PB depth:7365 ft.
Top PZ Location:Sec:2 Twp: 2N 66WFootage: 524 FNL  116 FEL
Bottom Hole Location:Sec:2 Twp: 2N 66WFootage: 464 FSL  240 FEL
Log Types:CBL, MWD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1055 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 13 ft., Bottom: 1054 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7761 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 424 ft., Bottom: 7761 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12060 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 7200 ft., Bottom: 12060 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7134 ft.
NIOBRARA7199 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2017                  Interval Top: 7826 ft.    Interval Bottom: 11848 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/25/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/30/2013Treatment End Date:4/2/2013
Treatment Summary:Stage 1 - Stage 20 treated with a total of 58,101, 1,653,284 lbs of 40/70 proppant
Total fluid used in treatment (bbls):58101Max pressure during treatment (psi):7354
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1384
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1653284Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7556 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2013Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 278
BTU_GAS 1289
CALC_BBLS_OIL 278
CALC_GOR 3784
CALC_MCF_GAS 1052
CASING_PRESS 2452
GRAVITY_OIL 50
MCF_GAS 1052
TUBING_PRESS 1603
Perforation Data:
Interval Top:7826 ft.# Of Holes:950
Interval Bottom:11848 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3169
Total Gas Produced (MCF)19004
GOR5996
GOR DeterminationBOE
Average BOE per Day17.662
Average MCFE per Day102.430

 Federal Financial Assurance  i 

 Tribal Well  i No