Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36054
Well Classification: OW Status: SI - 3/1/2023
Well Name/No:SIMMONS #42-20D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2023
FacilityID:430105LocationID:430104
County:WELD #123Location:SENE 20 6N64W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1792FNL  298 FELLat/Long: 40.473830 / -104.565660Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.473860 / -104.565690Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2013
End Date: 2/23/2013
Reported: 2/25/2013
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2023             Measured TD: 7166 ft.    Vertical TD: 7139 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2014
Proposed Top PZ Location:Sec:20 Twp: 6N 64W Footage: 1972 FNL  607 FEL
Bottom Hole Location:Sec:20 Twp: 6N 64W Footage: 1949 FNL  586 FEL
Proposed Depth/Form:7100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7100 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 7100 ft.

Wellbore Completed
Completion Date:12/29/2012
Spud Date:12/26/2012Spud Date Is:ACTUAL
Measured TD:7166 ft.Measured PB depth:7112 ft.
True Vertical TD:7139 ft.True Vertical PB depth:7095 ft.
Top PZ Location:Sec:20 Twp: 6N 64WFootage: 1972 FNL  607 FEL
Bottom Hole Location:Sec:20 Twp: 6N 64WFootage: 1949 FNL  586 FEL
Log Types:CBL, IND/CDL/CNL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7130 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 0 ft., Bottom: 7130 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4292 ft.
SHANNON4655 ft.
SHARON SPRINGS6573 ft.
NIOBRARA6691 ft.
CODELL7006 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/14/2017                 Interval Top: 7008 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7008-7016
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7008 ft.# Of Holes:24
Interval Bottom:7016 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 3/1/2023                  Interval Top: 6712 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/23/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/23/2013Treatment End Date:2/23/2013
Treatment Summary:Total Fluid: 6,508 bbls Gel Fluid: 4,413 bbls Slickwater Fluid: 2,071 bbls 15% HCl Acid: 24 bbls Total Silica Proppant: 475,460 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):6508Max pressure during treatment (psi):4655
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4453
Fresh water used in treatment (bbls):6484Disposition method For flowback:DISPOSAL
Total proppant used (lbs):475460Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 54
BTU_GAS 1270
CALC_BBLS_H2O 21
CALC_BBLS_OIL 54
CALC_GOR 7907
CALC_MCF_GAS 427
CASING_PRESS 462
GRAVITY_OIL 55
MCF_GAS 427
TUBING_PRESS 737
Perforation Data:
Interval Top:6712 ft.# Of Holes:52
Interval Bottom:7016 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/14/2017                 Interval Top: 6712 ft.    Interval Bottom: 6847 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:2/23/2013
Treatment Summary:Completed Depths: 6712-6847
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6712 ft.# Of Holes:28
Interval Bottom:6847 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
02/28/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No