Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36054
Well Classification: OW Status: SI - 3/1/2023
Well Name/No:SIMMONS #42-20D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2023
FacilityID:430105LocationID:430104
County:WELD #123Location:SENE 20 6N64W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1792FNL  298 FELLat/Long: 40.473830 / -104.565660Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.473860 / -104.565690Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2013
End Date: 2/23/2013
Reported: 2/25/2013
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2023             Measured TD: 7166 ft.    Vertical TD: 7139 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2014
Proposed Top PZ Location:Sec:20 Twp: 6N 64W Footage: 1972 FNL  607 FEL
Bottom Hole Location:Sec:20 Twp: 6N 64W Footage: 1949 FNL  586 FEL
Proposed Depth/Form:7100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7100 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 7100 ft.

Wellbore Completed
Completion Date:12/29/2012
Spud Date:12/26/2012Spud Date Is:ACTUAL
Measured TD:7166 ft.Measured PB depth:7112 ft.
True Vertical TD:7139 ft.True Vertical PB depth:7095 ft.
Top PZ Location:Sec:20 Twp: 6N 64WFootage: 1972 FNL  607 FEL
Bottom Hole Location:Sec:20 Twp: 6N 64WFootage: 1949 FNL  586 FEL
Log Types:CBL, IND/CDL/CNL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7130 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 0 ft., Bottom: 7130 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4292 ft.
SHANNON4655 ft.
SHARON SPRINGS6573 ft.
NIOBRARA6691 ft.
CODELL7006 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/14/2017                 Interval Top: 7008 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7008-7016
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7008 ft.# Of Holes:24
Interval Bottom:7016 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 3/1/2023                  Interval Top: 6712 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/23/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/23/2013Treatment End Date:2/23/2013
Treatment Summary:Total Fluid: 6,508 bbls Gel Fluid: 4,413 bbls Slickwater Fluid: 2,071 bbls 15% HCl Acid: 24 bbls Total Silica Proppant: 475,460 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):6508Max pressure during treatment (psi):4655
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4453
Fresh water used in treatment (bbls):6484Disposition method For flowback:DISPOSAL
Total proppant used (lbs):475460Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 54
BTU_GAS 1270
CALC_BBLS_H2O 21
CALC_BBLS_OIL 54
CALC_GOR 7907
CALC_MCF_GAS 427
CASING_PRESS 462
GRAVITY_OIL 55
MCF_GAS 427
TUBING_PRESS 737
Perforation Data:
Interval Top:6712 ft.# Of Holes:52
Interval Bottom:7016 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/14/2017                 Interval Top: 6712 ft.    Interval Bottom: 6847 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:2/23/2013
Treatment Summary:Completed Depths: 6712-6847
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6712 ft.# Of Holes:28
Interval Bottom:6847 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
02/28/2023
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No