Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36049
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:DOWDY #8-6-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:430091LocationID:430092
County:WELD #123Location:NESE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4861 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2427FSL  202 FELLat/Long: 40.152600 / -104.641220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.152616 / -104.641216Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/20/2012
End Date: 1/6/2013
Reported: 3/7/2013
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 7875 ft.    Vertical TD: 7726 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/29/2014
Proposed Top PZ Location:Sec:10 Twp: 2N 65W Footage: 1243 FSL  53 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65W Footage: 1240 FSL  52 FEL
Proposed Depth/Form:7865 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7865 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6806 ft., Bottom: 7865 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4832 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 100, Top: 4175 ft., Bottom: 4832 ft.

Wellbore Completed
Completion Date:10/5/2012
Spud Date:9/30/2012Spud Date Is:ACTUAL
Measured TD:7875 ft.Measured PB depth:7870 ft.
True Vertical TD:7726 ft.True Vertical PB depth:7721 ft.
Top PZ Location:Sec:10 Twp: 2N 65WFootage: 1243 FSL  53 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65WFootage: 1240 FSL  52 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 918 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 929 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7865 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 668, Top: 3000 ft., Bottom: 7875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4376 ft.
NIOBRARA6987 ft.
CODELL7269 ft.
J SAND7725 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7727 ft.    Interval Bottom: 7770 ft.

 Completed Information for Formation J SAND
1st Production Date:1/28/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/20/2012Treatment End Date:12/20/2012
Treatment Summary:Frac'd the J sand with 248,980# 20/40 sand with 117,894 gals SLF. 12-20-12
Total fluid used in treatment (bbls):2807Max pressure during treatment (psi):3053
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.23
Recycled water used in treatment (bbls):2807Total flowback volume recovered (bbls):224
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):248980Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7727 ft.# Of Holes:50
Interval Bottom:7770 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/13/2013                 Interval Top: 7271 ft.    Interval Bottom: 7285 ft.

 Completed Information for Formation CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/22/2012Treatment End Date:12/22/2012
Treatment Summary:Set CFP @ 7335'. Frac'd the Codell with 242,740# 20/40 sand and 77,784 gal SLF. 12-22-12
Total fluid used in treatment (bbls):1852Max pressure during treatment (psi):5790
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):1852Total flowback volume recovered (bbls):224
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):242740Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7271 ft.# Of Holes:42
Interval Bottom:7285 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/31/2013                 Interval Top: 7052 ft.    Interval Bottom: 7770 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/31/2013Treatment End Date:N/A
Treatment Summary:Drilled out sand and plugs to commingle the JSND-NBRR-CDL. 01-09-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7690 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 101
BBLS_OIL 55
BTU_GAS 1245
CALC_BBLS_H2O 101
CALC_BBLS_OIL 55
CALC_GOR 11255
CALC_MCF_GAS 619
CASING_PRESS 1349
GRAVITY_OIL 53
MCF_GAS 619
TUBING_PRESS 716
Perforation Data:
Interval Top:7052 ft.# Of Holes:132
Interval Bottom:7770 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 7052 ft.    Interval Bottom: 7285 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7052 ft.# Of Holes:82
Interval Bottom:7285 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/13/2013                 Interval Top: 7052 ft.    Interval Bottom: 7062 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/28/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/23/2012Treatment End Date:1/7/2013
Treatment Summary:Set CIBP @ 7120'. Frac'd the Niobrara with 250,140# 20/40 sand and 88,872 gals SLF. 01-07-13
Total fluid used in treatment (bbls):2116Max pressure during treatment (psi):7099
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):2116Total flowback volume recovered (bbls):244
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7052 ft.# Of Holes:40
Interval Bottom:7062 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2317
GOR
GOR DeterminationMCFE
Average BOE per Day1.074
Average MCFE per Day6.199

 Federal Financial Assurance  i 

 Tribal Well  i No