Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36048
Well Classification: GW Status: PA - 7/2/2024
Well Name/No:DOWDY #4-6-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/2/2024
FacilityID:430089LocationID:430092
County:WELD #123Location:NESE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4861 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2447FSL  202 FELLat/Long: 40.152660 / -104.641220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.152672 / -104.641220Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/19/2012
End Date: 12/23/2012
Reported: 3/7/2013
Days to report: 74
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/2/2024             Measured TD: 8362 ft.    Vertical TD: 7767 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/2/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/29/2014
Proposed Top PZ Location:Sec:10 Twp: 2N 65W Footage: 1338 FSL  2626 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65W Footage: 1310 FSL  2674 FEL
Proposed Depth/Form:8326 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8326 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 7249 ft., Bottom: 8326 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5111 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 100, Top: 4455 ft., Bottom: 5111 ft.

Wellbore Completed
Completion Date:10/15/2012
Spud Date:10/11/2012Spud Date Is:ACTUAL
Measured TD:8362 ft.Measured PB depth:8322 ft.
True Vertical TD:7767 ft.True Vertical PB depth:7727 ft.
Top PZ Location:Sec:10 Twp: 2N 65WFootage: 1338 FSL  2626 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65WFootage: 1310 FSL  2674 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 930 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8347 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 3440 ft., Bottom: 8362 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4702 ft.
NIOBRARA7491 ft.
CODELL7745 ft.
J SAND8202 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/2/2024                  Interval Top: 8204 ft.    Interval Bottom: 8249 ft.

 Completed Information for Formation J SAND
1st Production Date:1/28/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/19/2012Treatment End Date:12/19/2012
Treatment Summary:Frac'd the J Sand with 249,000# 20/40 sand with 131,292 gals SLF. 12-19-12
Total fluid used in treatment (bbls):3126Max pressure during treatment (psi):5107
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):3126Total flowback volume recovered (bbls):247
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):249000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8204 ft.# Of Holes:56
Interval Bottom:8249 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 7747 ft.    Interval Bottom: 7761 ft.

 Completed Information for Formation CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2012Treatment End Date:12/21/2012
Treatment Summary:Set CFP @ 7840'. 12-20-12 Frac'd the Codell with 240,080# 20/40 sand and 109,452 gals SLF. 12-21-12
Total fluid used in treatment (bbls):2606Max pressure during treatment (psi):6113
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.54
Recycled water used in treatment (bbls):2606Total flowback volume recovered (bbls):247
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):240080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7747 ft.# Of Holes:42
Interval Bottom:7761 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/30/2013                 Interval Top: 7547 ft.    Interval Bottom: 8249 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/30/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7400'. 01-12-13 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 01-18-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8166 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 69
BTU_GAS 1248
CALC_BBLS_H2O 100
CALC_BBLS_OIL 69
CALC_GOR 7406
CALC_MCF_GAS 511
CASING_PRESS 1305
GRAVITY_OIL 53
MCF_GAS 511
TUBING_PRESS 651
Perforation Data:
Interval Top:7547 ft.# Of Holes:146
Interval Bottom:8249 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/2/2024                  Interval Top: 7547 ft.    Interval Bottom: 7761 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7547 ft.# Of Holes:90
Interval Bottom:7761 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 7547 ft.    Interval Bottom: 7599 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/28/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/22/2012Treatment End Date:12/22/2012
Treatment Summary:Set CBP @ 7609'. 12-22-12 Frac'd the Niobrara with 260,300# 20/40 sand with 93,324 gals SLF. 12-23-12
Total fluid used in treatment (bbls):2222Max pressure during treatment (psi):5419
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):247
Fresh water used in treatment (bbls):2222Disposition method For flowback:DISPOSAL
Total proppant used (lbs):260300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7547 ft.# Of Holes:48
Interval Bottom:7599 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/02/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No