|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/2/2024 Measured TD: 8362 ft. Vertical TD: 7767 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/2/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/29/2014 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 65W | Footage: 1338 FSL 2626 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 65W | Footage: 1310 FSL 2674 FEL | | Proposed Depth/Form: | 8326 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8326 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 7249 ft., Bottom: 8326 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5111 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 4455 ft., Bottom: 5111 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/15/2012 | | Spud Date: | 10/11/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8362 ft. | Measured PB depth: | 8322 ft. | | True Vertical TD: | 7767 ft. | True Vertical PB depth: | 7727 ft. | | Top PZ Location: | Sec:10 Twp: 2N 65W | Footage: 1338 FSL 2626 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 65W | Footage: 1310 FSL 2674 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 930 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8347 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 3440 ft., Bottom: 8362 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4702 ft. | | | | | NIOBRARA | 7491 ft. | | | | | CODELL | 7745 ft. | | | | | J SAND | 8202 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/2/2024 Interval Top: 8204 ft. Interval Bottom: 8249 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/28/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/19/2012 | Treatment End Date: | 12/19/2012 | | Treatment Summary: | Frac'd the J Sand with 249,000# 20/40 sand with 131,292 gals SLF. 12-19-12 | | Total fluid used in treatment (bbls): | 3126 | Max pressure during treatment (psi): | 5107 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | 3126 | Total flowback volume recovered (bbls): | 247 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 249000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8204 ft. | # Of Holes: | 56 | | Interval Bottom: | 8249 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/15/2013 Interval Top: 7747 ft. Interval Bottom: 7761 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/28/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/21/2012 | Treatment End Date: | 12/21/2012 | | Treatment Summary: | Set CFP @ 7840'. 12-20-12
Frac'd the Codell with 240,080# 20/40 sand and 109,452 gals SLF. 12-21-12 | | Total fluid used in treatment (bbls): | 2606 | Max pressure during treatment (psi): | 6113 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.54 | | Recycled water used in treatment (bbls): | 2606 | Total flowback volume recovered (bbls): | 247 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 240080 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7747 ft. | # Of Holes: | 42 | | Interval Bottom: | 7761 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/30/2013 Interval Top: 7547 ft. Interval Bottom: 8249 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/28/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/30/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7400'. 01-12-13
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 01-18-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8166 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/30/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BBLS_OIL | 69 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 100 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 7406 | | CALC_MCF_GAS | 511 | | CASING_PRESS | 1305 | | GRAVITY_OIL | 53 | | MCF_GAS | 511 | | TUBING_PRESS | 651 |
| | Perforation Data: | | Interval Top: | 7547 ft. | # Of Holes: | 146 | | Interval Bottom: | 8249 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/2/2024 Interval Top: 7547 ft. Interval Bottom: 7761 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/28/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7547 ft. | # Of Holes: | 90 | | Interval Bottom: | 7761 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/15/2013 Interval Top: 7547 ft. Interval Bottom: 7599 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/28/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/22/2012 | Treatment End Date: | 12/22/2012 | | Treatment Summary: | Set CBP @ 7609'. 12-22-12
Frac'd the Niobrara with 260,300# 20/40 sand with 93,324 gals SLF. 12-23-12 | | Total fluid used in treatment (bbls): | 2222 | Max pressure during treatment (psi): | 5419 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 247 | | Fresh water used in treatment (bbls): | 2222 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 260300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7547 ft. | # Of Holes: | 48 | | Interval Bottom: | 7599 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/02/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|