Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36046
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:DOWDY #41-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:430087LocationID:317881
County:WELD #123Location:NENE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4858 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1114FNL  1112 FELLat/Long: 40.157440 / -104.644450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.157459 / -104.644448Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2012
End Date: 12/14/2012
Reported: 1/31/2013
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 7830 ft.    Vertical TD: 7747 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/29/2014
Proposed Top PZ Location:Sec:10 Twp: 2N 65W Footage: 550 FNL  563 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65W Footage: 544 FNL  566 FEL
Proposed Depth/Form:7807 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7807 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6739 ft., Bottom: 7807 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4775 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 90, Top: 4143 ft., Bottom: 4775 ft.

Wellbore Completed
Completion Date:10/28/2012
Spud Date:10/24/2012Spud Date Is:ACTUAL
Measured TD:7830 ft.Measured PB depth:7773 ft.
True Vertical TD:7747 ft.True Vertical PB depth:7690 ft.
Top PZ Location:Sec:10 Twp: 2N 65WFootage: 550 FNL  563 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65WFootage: 544 FNL  566 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 930 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7819 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 3040 ft., Bottom: 7830 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4384 ft.
NIOBRARA6922 ft.
CODELL7203 ft.
J SAND7657 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7662 ft.    Interval Bottom: 7698 ft.

 Completed Information for Formation J SAND
1st Production Date:1/24/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2012Treatment End Date:12/12/2012
Treatment Summary:Frac'd the J Sand with 251,060# 20/40 sand with 119,574 gals SLF. 12-13-12
Total fluid used in treatment (bbls):2847Max pressure during treatment (psi):3278
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):2847Total flowback volume recovered (bbls):367
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251060Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7662 ft.# Of Holes:50
Interval Bottom:7698 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 7204 ft.    Interval Bottom: 7218 ft.

 Completed Information for Formation CODELL
1st Production Date:1/24/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2012Treatment End Date:12/14/2012
Treatment Summary:Set CFP @ 7263'. 12-13-12 Frac'd the Codell with 251,220# sand with 79,170 gals SLF. 12-14-12
Total fluid used in treatment (bbls):1885Max pressure during treatment (psi):5282
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):1885Total flowback volume recovered (bbls):367
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251220Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7204 ft.# Of Holes:42
Interval Bottom:7218 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/29/2013                 Interval Top: 6972 ft.    Interval Bottom: 7698 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/24/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/29/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 6900'. 01-08-13 Drilled up CBP, CFP's to commingle the JSND-NBRR-CDL. 01-09-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7632 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 63
BBLS_OIL 17
BTU_GAS 1139
CALC_BBLS_H2O 63
CALC_BBLS_OIL 17
CALC_GOR 6059
CALC_MCF_GAS 103
CASING_PRESS 1180
GRAVITY_OIL 38
MCF_GAS 103
TUBING_PRESS 326
Perforation Data:
Interval Top:6972 ft.# Of Holes:140
Interval Bottom:7698 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 6972 ft.    Interval Bottom: 7218 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/24/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6972 ft.# Of Holes:90
Interval Bottom:7218 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 6972 ft.    Interval Bottom: 6984 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/24/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2012Treatment End Date:12/14/2012
Treatment Summary:Set CFP @ 7050'. 12-14-12 Frac'd the Niobrara with 250380# 20/40 sand with 90,762 gals SLF. 12-14-12
Total fluid used in treatment (bbls):2161Max pressure during treatment (psi):5246
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):2161Total flowback volume recovered (bbls):367
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250380Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6972 ft.# Of Holes:48
Interval Bottom:6984 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)215
Total Gas Produced (MCF)8015
GOR37279
GOR DeterminationMCFE
Average BOE per Day4.112
Average MCFE per Day23.837

 Federal Financial Assurance  i 

 Tribal Well  i No