Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36044
Well Classification: GW Status: SI - 11/1/2022
Well Name/No:DOWDY #8-2-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2022
FacilityID:430085LocationID:317881
County:WELD #123Location:NENE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4858 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1114FNL  1102 FELLat/Long: 40.157440 / -104.644410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.157451 / -104.644412Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2012
End Date: 12/14/2012
Reported: 1/31/2013
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2022             Measured TD: 7883 ft.    Vertical TD: 7748 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/29/2014
Proposed Top PZ Location:Sec:10 Twp: 2N 65W Footage: 1355 FNL  52 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65W Footage: 1339 FNL  57 FEL
Proposed Depth/Form:7844 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7844 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6786 ft., Bottom: 7844 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4813 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 100, Top: 4173 ft., Bottom: 4813 ft.

Wellbore Completed
Completion Date:10/24/2012
Spud Date:10/20/2012Spud Date Is:ACTUAL
Measured TD:7883 ft.Measured PB depth:7813 ft.
True Vertical TD:7748 ft.True Vertical PB depth:7678 ft.
Top PZ Location:Sec:10 Twp: 2N 65WFootage: 1355 FNL  52 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65WFootage: 1339 FNL  57 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7883 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 3110 ft., Bottom: 7883 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4364 ft.
NIOBRARA6994 ft.
CODELL7257 ft.
J SAND7717 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 11/1/2022                 Interval Top: 7721 ft.    Interval Bottom: 7762 ft.

 Completed Information for Formation J SAND
1st Production Date:1/24/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/12/2012Treatment End Date:12/14/2012
Treatment Summary:Frac'd the J Sand 250,000# 20/40 sand with 113,652 gals SLF. 12-13-12
Total fluid used in treatment (bbls):2706Max pressure during treatment (psi):3382
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):2706Total flowback volume recovered (bbls):249
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7721 ft.# Of Holes:50
Interval Bottom:7762 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 7258 ft.    Interval Bottom: 7272 ft.

 Completed Information for Formation CODELL
1st Production Date:1/23/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/14/2012Treatment End Date:12/15/2012
Treatment Summary:Set CFP @ 7322'. 12-13-12 Frac'd the Codell with 250,140# 20/40 sand with 77,616 gals SLF. 12-14-12
Total fluid used in treatment (bbls):1848Max pressure during treatment (psi):5038
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):1848Total flowback volume recovered (bbls):249
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7258 ft.# Of Holes:42
Interval Bottom:7272 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/30/2013                 Interval Top: 7029 ft.    Interval Bottom: 7762 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/24/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/30/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 6935'. 01-05-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 01-07-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7702 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 63
BBLS_OIL 56
BTU_GAS 1139
CALC_BBLS_H2O 63
CALC_BBLS_OIL 56
CALC_GOR 5839
CALC_MCF_GAS 327
CASING_PRESS 1334
GRAVITY_OIL 38
MCF_GAS 327
TUBING_PRESS 724
Perforation Data:
Interval Top:7029 ft.# Of Holes:140
Interval Bottom:7762 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 11/1/2022                 Interval Top: 7029 ft.    Interval Bottom: 7272 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/24/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7029 ft.# Of Holes:90
Interval Bottom:7272 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 7029 ft.    Interval Bottom: 7041 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/24/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/14/2012Treatment End Date:12/15/2012
Treatment Summary:Set CFP @7100. 12-14-12 Frac'd the Niobrara with 251,960# 20/40 sand with 87,948 gals SLF. 12-14-12
Total fluid used in treatment (bbls):2094Max pressure during treatment (psi):5263
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.08
Recycled water used in treatment (bbls):2094Total flowback volume recovered (bbls):249
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):251960Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7029 ft.# Of Holes:48
Interval Bottom:7041 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
10/31/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No