Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35972
Well Classification: OW Status: SI - 6/1/2025
Well Name/No:BARCLAY #37N-28HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2025
FacilityID:429927LocationID:330050
County:WELD #123Location:NWNE 28 3N66W 6
Field:WATTENBERG - #90750Elevation:4966 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:849FNL  1865 FELLat/Long: 40.200916 / -104.779616Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.200913 / -104.779620Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/19/2013
End Date: 3/19/2013
Reported: 5/22/2013
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 6/1/2025             Measured TD: 11582 ft.    Vertical TD: 7187 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 6/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2014
Proposed Top PZ Location:Sec:28 Twp: 3N 66W Footage: 659 FNL  1250 FEL
Bottom Hole Location:Sec:28 Twp: 3N 66W Footage: 460 FSL  1250 FEL
Proposed Depth/Form:11789 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7628 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 0 ft., Bottom: 7628 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6528 ft., Depth: 11789 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/24/2012
Spud Date:12/25/2012Spud Date Is:ACTUAL
Measured TD:11582 ft.Measured PB depth:11456 ft.
True Vertical TD:7187 ft.True Vertical PB depth:7188 ft.
Top PZ Location:Sec:28 Twp: 3N 66WFootage: 691 FNL  1257 FEL
Bottom Hole Location:Sec:28 Twp: 3N 66WFootage: 701 FSL  1247 FEL
Log Types:PRE FORM 5
Log Types:CBL; MWD: NFE-GR; (4) MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 730 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 730 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7667 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 757, Top: 60 ft., Bottom: 7667 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6691 ft., Depth: 11465 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7259 ft.
NIOBRARA7397 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 6/1/2025                  Interval Top: 7695 ft.    Interval Bottom: 11582 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/24/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2013Treatment End Date:3/19/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7695-11582. 16593 BBL CROSSLINK GEL, 109 BBL LINEAR GEL, 23806 BBL SLICKWATER, 40508 BBL TOTAL FLUID. 357594# 40/70 SAND, 1015761# 30/50 SAND, 149297# CRC 20/40 SAND, 1522652# TOTAL SAND
Total fluid used in treatment (bbls):40508Max pressure during treatment (psi):7171
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6494
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1522652Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7210 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 404
BTU_GAS 1200
CALC_BBLS_H2O 194
CALC_BBLS_OIL 404
CALC_GOR 3059
CALC_MCF_GAS 1236
CASING_PRESS 2520
GRAVITY_OIL 53
MCF_GAS 1236
TUBING_PRESS 1800
Perforation Data:
Interval Top:7695 ft.# Of Holes:0
Interval Bottom:11582 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1548
Total Gas Produced (MCF)15230
GOR9838
GOR DeterminationBOE
Average BOE per Day11.532
Average MCFE per Day66.884

 Federal Financial Assurance  i 

 Tribal Well  i No