Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35971
Well Classification: OW Status: SI - 6/1/2025
Well Name/No:BARCLAY #15N-28HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2025
FacilityID:429926LocationID:330050
County:WELD #123Location:NWNE 28 3N66W 6
Field:WATTENBERG - #90750Elevation:4966 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:819FNL  1865 FELLat/Long: 40.200998 / -104.779617Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.200998 / -104.779621Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2013
End Date: 3/18/2013
Reported: 5/22/2013
Days to report: 65
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 6/1/2025             Measured TD: 11828 ft.    Vertical TD: 7318 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 6/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2014
Proposed Top PZ Location:Sec:28 Twp: 3N 66W Footage: 699 FNL  1801 FEL
Bottom Hole Location:Sec:28 Twp: 3N 66W Footage: 485 FSL  1879 FEL
Proposed Depth/Form:11830 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7632 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 0 ft., Bottom: 7632 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6526 ft., Depth: 11830 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/5/2013
Spud Date:10/26/2012Spud Date Is:ACTUAL
Measured TD:11828 ft.Measured PB depth:11804 ft.
True Vertical TD:7318 ft.True Vertical PB depth:7317 ft.
Top PZ Location:Sec:28 Twp: 3N 66WFootage: 699 FNL  1801 FEL
Bottom Hole Location:Sec:28 Twp: 3N 66WFootage: 485 FSL  1879 FEL
Log Types:PRE FORM 5
Log Types:CBL; MWD: GR, MPR-GR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 729 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7722 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 774, Top: 54 ft., Bottom: 7722 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6676 ft., Depth: 11813 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7355 ft.
NIOBRARA7636 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 6/1/2025                  Interval Top: 7780 ft.    Interval Bottom: 11828 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/24/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/16/2013Treatment End Date:3/18/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7780-11828. 16947 BBL CROSSLINK GEL, 661 BBL LINEAR GEL, 101781 BBL SLICKWATER, 24 BBL ACID, 119413 BBL TOTAL FLUID. 2614811# 40/70 SAND, 525142# 30/50 SAND, 31681# CRC 20/40 SAND, 3171634# TOTAL SAND.
Total fluid used in treatment (bbls):119413Max pressure during treatment (psi):7416
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7579
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3171634Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7211 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 223
BBLS_OIL 419
BTU_GAS 1200
CALC_BBLS_H2O 223
CALC_BBLS_OIL 419
CALC_GOR 2747
CALC_MCF_GAS 1151
CASING_PRESS 2533
GRAVITY_OIL 53
MCF_GAS 1151
TUBING_PRESS 1797
Perforation Data:
Interval Top:7780 ft.# Of Holes:0
Interval Bottom:11828 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1862
Total Gas Produced (MCF)18708
GOR10047
GOR DeterminationBOE
Average BOE per Day13.984
Average MCFE per Day81.113

 Federal Financial Assurance  i 

 Tribal Well  i No