Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35948
Well Classification: OW Status: PR - 2/1/2023
Well Name/No:HUDSON #36N-35HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:429867LocationID:429864
Municipality/County:HUDSON / WELD #123Location:NENW 26 2N65W 6
Field:WATTENBERG - #90750Elevation:4910 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:352FNL  2140 FWLLat/Long: 40.115859 / -104.633053Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.115859 / -104.633056Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/1/2013
End Date: 7/8/2013
Reported: 8/15/2013
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2023             Measured TD: 16950 ft.    Vertical TD: 6941 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/8/2014
Proposed Top PZ Location:Sec:26 Twp: 2N 65W Footage: 927 FNL  2762 FWL
Bottom Hole Location:Sec:35 Twp: 2N 65W Footage: 460 FSL  2640 FWL
Proposed Depth/Form:16608 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 1300 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7313 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 7313 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6314 ft., Depth: 16608 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/4/2013
Spud Date:2/1/2013Spud Date Is:ACTUAL
Measured TD:16950 ft.Measured PB depth:16926 ft.
True Vertical TD:6941 ft.True Vertical PB depth:6941 ft.
Top PZ Location:Sec:26 Twp: 2N 65WFootage: 663 FNL  2634 FWL
Bottom Hole Location:Sec:35 Twp: 2N 65WFootage: 487 FSL  2632 FWL
Log Types:CBL; GR; RES; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1328 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 553, Top: 0 ft., Bottom: 1328 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7415 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 716, Top: 35 ft., Bottom: 7415 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6462 ft., Depth: 16935 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6924 ft.
NIOBRARA6999 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2023                  Interval Top: 7466 ft.    Interval Bottom: 16950 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/18/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/1/2013Treatment End Date:7/8/2013
Treatment Summary:OPEN HOLE COMPLETION FROM 7466-16950. 47406 BBL CROSSLINK GEL, 4678 BBL LINEAR GEL, 158371 BBL SLICKWATER, 210455 BBL TOTAL FLUID. 1499616# 40/70 SAND, 4124209# 30/50 SAND, 5713715# TOTAL SAND.
Total fluid used in treatment (bbls):210455Max pressure during treatment (psi):7576
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):26327
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5713715Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6943 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 330
BTU_GAS 1775
CALC_BBLS_OIL 330
CALC_GOR 1127
CALC_MCF_GAS 372
CASING_PRESS 2146
GRAVITY_OIL 44
MCF_GAS 372
TUBING_PRESS 1624
Perforation Data:
Interval Top:7466 ft.# Of Holes:0
Interval Bottom:16950 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4109
Total Gas Produced (MCF)47976
GOR11675
GOR DeterminationBOE
Average BOE per Day33.882
Average MCFE per Day196.511

 Federal Financial Assurance  i 

 Tribal Well  i No