Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35941
Well Classification: OW Status: PA - 8/27/2019
Well Name/No:Latham #14-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/27/2019
FacilityID:429827LocationID:429825
County:WELD #123Location:SWSW 12 4N63W 6
Field:WATTENBERG - #90750Elevation:4566 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:155FSL  975 FWLLat/Long: 40.320390 / -104.392380Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.320380 / -104.392380Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/23/2012
End Date: 9/23/2012
Reported: 12/3/2012
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/27/2019             Measured TD: 6708 ft.    Vertical TD: 6658 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/27/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:12 Twp: 4N 63W Footage: 660 FSL  660 FWL
Bottom Hole Location:Sec:12 Twp: 4N 63W Footage: 660 FSL  660 FWL
Proposed Depth/Form:6720 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: SWSW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 170, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6725 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 131, Top: 6000 ft., Bottom: 6725 ft.

Wellbore Completed
Completion Date:8/20/2012
Spud Date:8/17/2012Spud Date Is:ACTUAL
Measured TD:6708 ft.Measured PB depth:6673 ft.
True Vertical TD:6658 ft.True Vertical PB depth:6623 ft.
Top PZ Location:Sec:12 Twp: 4n 63wFootage: 653 FSL  667 FWL
Bottom Hole Location:Sec:12 Twp: 4n 63wFootage: 653 FSL  667 FWL
Log Types:Triple Combo & CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 754 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 754 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6673 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 2905 ft., Bottom: 6673 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6117 ft.
NIOBRARA6256 ft.
CODELL6520 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/29/2015                 Interval Top: 6520 ft.    Interval Bottom: 6530 ft.

 Completed Information for Formation CODELL
1st Production Date:10/16/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6520 ft.# Of Holes:40
Interval Bottom:6530 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/27/2019                 Interval Top: 6262 ft.    Interval Bottom: 6530 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/16/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:6233 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2012Test Method:Flowing
Hours Tested:48Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 60
BTU_GAS 1311
CALC_BBLS_H2O 3
CALC_BBLS_OIL 30
CALC_GOR 550
CALC_MCF_GAS 16
CASING_PRESS 1220
GRAVITY_OIL 43
MCF_GAS 33
TUBING_PRESS 835
Perforation Data:
Interval Top:6262 ft.# Of Holes:88
Interval Bottom:6530 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/29/2015                 Interval Top: 6262 ft.    Interval Bottom: 6408 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/16/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6262 ft.# Of Holes:48
Interval Bottom:6408 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/27/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No