Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35939
Well Classification: OW Status: PR - 6/1/2025
Well Name/No:Latham #14-11-12HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2025
FacilityID:429824LocationID:429825
County:WELD #123Location:SWSW 12 4N63W 6
Field:WATTENBERG - #90750Elevation:4566 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:155FSL  1005 FWLLat/Long: 40.320390 / -104.392270Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.320390 / -104.392270Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/19/2012
End Date: 9/19/2012
Reported: 12/3/2012
Days to report: 75
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2025             Measured TD: 10963 ft.    Vertical TD: 6293 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:12 Twp: 4N 63W Footage: 675 FSL  979 FWL
Bottom Hole Location:Sec:12 Twp: 4N 63W Footage: 492 FNL  993 FWL
Proposed Depth/Form:10937 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-538 , Unit Acreage: 640, Drill Unit: ALL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6605 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6605 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6505 ft., Depth: 10937 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/30/2012
Spud Date:8/21/2012Spud Date Is:ACTUAL
Measured TD:10963 ft.Measured PB depth:10963 ft.
True Vertical TD:6293 ft.True Vertical PB depth:6293 ft.
Top PZ Location:Sec:12 Twp: 4N 63WFootage: 675 FSL  979 FWL
Bottom Hole Location:Sec:12 Twp: 4N 63WFootage: 492 FNL  993 FWL
Log Types:Gamma Ray, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 731 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 731 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6733 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 2120 ft., Bottom: 6733 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6665 ft., Depth: 10963 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6112 ft.
NIOBRARA6318 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2025                  Interval Top: 6783 ft.    Interval Bottom: 10963 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/25/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/19/2012Treatment End Date:9/21/2012
Treatment Summary:18 stages: Niobrara pumped a total of 58323 bbls of fluid and 4165766# of sand, ATP 4970 psi, ATR 48.6 bpm, Final ISDP 3461 psi, completed with sliding sleeves and casing packers.
Total fluid used in treatment (bbls):58323Max pressure during treatment (psi):5557
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):28903
Fresh water used in treatment (bbls):58323Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4165766Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5753 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/8/2012Test Method:Flowing
Hours Tested:72Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 465
BBLS_OIL 1605
BTU_GAS 1311
CALC_BBLS_H2O 155
CALC_BBLS_OIL 535
CALC_GOR 1062
CALC_MCF_GAS 568
GRAVITY_OIL 43
MCF_GAS 1704
Perforation Data:
Interval Top:6783 ft.# Of Holes:
Interval Bottom:10963 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4919
Total Gas Produced (MCF)12896
GOR2621
GOR DeterminationBOE
Average BOE per Day19.445
Average MCFE per Day112.757

 Federal Financial Assurance  i 

 Tribal Well  i No