Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35907
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:DOVE #24N-13HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:429773LocationID:429771
County:WELD #123Location:NWNE 12 2N66W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:365FNL  1386 FELLat/Long: 40.159162 / -104.720808Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.159170 / -104.720804Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/4/2013
End Date: 9/20/2013
Reported: 11/6/2013
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 14380 ft.    Vertical TD: 7246 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/30/2014
Proposed Top PZ Location:Sec:12 Twp: 2N 66W Footage: 1115 FNL  1317 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 2221 FNL  1416 FEL
Proposed Depth/Form:13831 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7531 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7531 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6600 ft., Depth: 14354 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/27/2013
Spud Date:2/28/2013Spud Date Is:ACTUAL
Measured TD:14380 ft.Measured PB depth:14336 ft.
True Vertical TD:7246 ft.True Vertical PB depth:7196 ft.
Top PZ Location:Sec:12 Twp: 2N 66WFootage: 633 FNL  1191 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 2192 FNL  1178 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1037 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 1037 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7599 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 7599 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6696 ft., Depth: 14345 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7111 ft.
NIOBRARA7219 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7657 ft.    Interval Bottom: 14380 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/10/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/4/2013Treatment End Date:9/20/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7657-14380. 438 BBL ACID,70644 BBL CROSSLINK GEL,7119 BBL LINEAR GEL,171620 BBL SLICKWATER,249821 BBL TOTAL FLUID. 2092381# 30/50 OTTAWA/ST. PETERS SAND,5798961# 40/70 OTTAWA/ST. PETERS SAND,7891342# TOTAL SAND.
Total fluid used in treatment (bbls):249821Max pressure during treatment (psi):7739
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):7691Total flowback volume recovered (bbls):13644
Fresh water used in treatment (bbls):163929Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7891342Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7188 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 417
BBLS_OIL 132
BTU_GAS 1279
CALC_BBLS_H2O 417
CALC_BBLS_OIL 132
CALC_GOR 2189
CALC_MCF_GAS 289
CASING_PRESS 2650
GRAVITY_OIL 49
MCF_GAS 289
TUBING_PRESS 1881
Perforation Data:
Interval Top:7657 ft.# Of Holes:0
Interval Bottom:14380 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)36
Total Gas Produced (MCF)1222
GOR33944
GOR DeterminationMCFE
Average BOE per Day1.988
Average MCFE per Day11.541

 Federal Financial Assurance  i 

 Tribal Well  i No