Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35900
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:DOVE #25N-13HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:429763LocationID:429764
County:WELD #123Location:NENW 12 2N66W 6
Field:WATTENBERG - #90750Elevation:4982 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:365FNL  2117 FWLLat/Long: 40.159150 / -104.727285Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.159155 / -104.727296Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/29/2013
End Date: 10/2/2013
Reported: 11/21/2013
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 14343 ft.    Vertical TD: 7252 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/30/2014
Proposed Top PZ Location:Sec:12 Twp: 2N 66W Footage: 747 FNL  2520 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 2187 FNL  2565 FEL
Proposed Depth/Form:14064 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7549 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 7549 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6550 ft., Depth: 14064 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/13/2013
Spud Date:3/3/2013Spud Date Is:ACTUAL
Measured TD:14343 ft.Measured PB depth:14324 ft.
True Vertical TD:7252 ft.True Vertical PB depth:7249 ft.
Top PZ Location:Sec:12 Twp: 2N 66WFootage: 747 FNL  2520 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 2187 FNL  2565 FEL
Log Types:CBL,GR,MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1022 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 433, Top: 0 ft., Bottom: 1022 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7659 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 230 ft., Bottom: 7659 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6614 ft., Depth: 14333 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7226 ft.
NIOBRARA7383 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 7700 ft.    Interval Bottom: 14343 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/29/2013Treatment End Date:10/2/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7700-14343. 25 BBL ACID,33404 BBL CROSSLINK GEL,5746 BBL LINEAR GEL,93402 BBL SLICKWATER,132576 BBL TOTAL FLUID. 2608157# 40/70 SAND ,995801# 30/50 OTTAWA/ST. PETERS SAND,3603958# TOTAL SAND.
Total fluid used in treatment (bbls):132576Max pressure during treatment (psi):7404
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):25Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6266
Fresh water used in treatment (bbls):132551Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3603958Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7211 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 169
BBLS_OIL 320
BTU_GAS 1279
CALC_BBLS_H2O 169
CALC_BBLS_OIL 320
CALC_GOR 1959
CALC_MCF_GAS 627
CASING_PRESS 2347
GRAVITY_OIL 48
MCF_GAS 627
TUBING_PRESS 1890
Perforation Data:
Interval Top:7700 ft.# Of Holes:0
Interval Bottom:14343 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4301
Total Gas Produced (MCF)65265
GOR15174
GOR DeterminationMCFE
Average BOE per Day42.623
Average MCFE per Day247.174

 Federal Financial Assurance  i 

 Tribal Well  i No