Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35895
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:DOVE #8N-13HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:429758LocationID:429757
County:WELD #123Location:NENE 12 2N66W 6
Field:WATTENBERG - #90750Elevation:4968 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:365FNL  558 FELLat/Long: 40.159168 / -104.717847Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.159175 / -104.717849Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/28/2013
End Date: 9/2/2013
Reported: 10/15/2013
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 14073 ft.    Vertical TD: 7195 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/29/2014
Proposed Top PZ Location:Sec:12 Twp: 2N 66W Footage: 954 FNL  715 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 2225 FNL  715 FEL
Proposed Depth/Form:13410 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7541 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7541 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6541 ft., Depth: 14024 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/21/2013
Spud Date:2/23/2013Spud Date Is:ACTUAL
Measured TD:14073 ft.Measured PB depth:14016 ft.
True Vertical TD:7195 ft.True Vertical PB depth:7195 ft.
Top PZ Location:Sec:12 Twp: 2N 66WFootage: 759 FNL  738 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 2200 FNL  704 FEL
Log Types:CBL; GR; RES; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1032 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 456, Top: 0 ft., Bottom: 1032 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7420 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 741, Top: 0 ft., Bottom: 7420 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6568 ft., Depth: 14063 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 416, Top: 6567 ft., Bottom: 14063 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7105 ft.
NIOBRARA7200 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 7434 ft.    Interval Bottom: 13942 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/29/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:9/2/2013
Treatment Summary:PERF AND FRAC FROM 7434-13942 321 BBL ACID,5540 BBL CROSSLINK GEL,121793 BBL SLICKWATER,127654 BBL TOTAL FLUID. 154460# 30/50 OTTAWA/ST. PETERS SAND,3632417# 40/70 OTTAWA/ST. PETERS SAND,3786877# TOTAL SAND.
Total fluid used in treatment (bbls):127654Max pressure during treatment (psi):7023
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):321Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):5558Total flowback volume recovered (bbls):18722
Fresh water used in treatment (bbls):116235Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3786877Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7223 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 574
BBLS_OIL 135
BTU_GAS 1382
CALC_BBLS_H2O 574
CALC_BBLS_OIL 135
CALC_GOR 2563
CALC_MCF_GAS 346
CASING_PRESS 2372
GRAVITY_OIL 49
MCF_GAS 346
TUBING_PRESS 1877
Perforation Data:
Interval Top:7434 ft.# Of Holes:1512
Interval Bottom:13942 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)6948
Total Gas Produced (MCF)101393
GOR14593
GOR DeterminationBOE
Average BOE per Day66.978
Average MCFE per Day388.499

 Federal Financial Assurance  i 

 Tribal Well  i No