Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35879
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:Ione #1D-8H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:429719LocationID:429720
County:WELD #123Location:NENE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4904 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:228FNL  1256 FELLat/Long: 40.159220 / -104.796160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.159220 / -104.796170Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/26/2013
End Date: 3/3/2013
Reported: 5/24/2013
Days to report: 82
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2025             Measured TD: 11633 ft.    Vertical TD: 7189 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/26/2014
Proposed Top PZ Location:Sec:8 Twp: 2N 66W Footage: 664 FNL  1614 FEL
Bottom Hole Location:Sec:8 Twp: 2N 66W Footage: 460 FSL  1600 FEL
Proposed Depth/Form:11722 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7568 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 926, Top: 500 ft., Bottom: 7568 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11722 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 367, Top: 7268 ft., Bottom: 11722 ft.

Wellbore Completed
Completion Date:10/14/2012
Spud Date:9/30/2012Spud Date Is:ACTUAL
Measured TD:11633 ft.Measured PB depth:11558 ft.
True Vertical TD:7189 ft.True Vertical PB depth:7189 ft.
Top PZ Location:Sec:8 Twp: 2N 66WFootage: 567 FNL  1621 FEL
Bottom Hole Location:Sec:8 Twp: 2N 66WFootage: 495 FSL  1635 FEL
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 874 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 874 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7410 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 555 ft., Bottom: 7410 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11607 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 6910 ft., Bottom: 11633 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7044 ft.
NIOBRARA7120 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7422 ft.    Interval Bottom: 11266 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/26/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/26/2013Treatment End Date:3/2/2013
Treatment Summary:Stages 1-19: Treated with a total of 75,590 bbls fluid.
Total fluid used in treatment (bbls):75590Max pressure during treatment (psi):8417
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):75590Total flowback volume recovered (bbls):2437
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3332141Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7346 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BBLS_OIL 246
BTU_GAS 1273
CALC_BBLS_H2O 35
CALC_BBLS_OIL 246
CALC_GOR 5085
CALC_MCF_GAS 1251
CASING_PRESS 1787
GRAVITY_OIL 50
MCF_GAS 1251
TUBING_PRESS 1404
Perforation Data:
Interval Top:7422 ft.# Of Holes:950
Interval Bottom:11266 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1242
Total Gas Produced (MCF)38993
GOR31395
GOR DeterminationMCFE
Average BOE per Day21.764
Average MCFE per Day126.216

 Federal Financial Assurance  i 

 Tribal Well  i No